29915 BLUE RIDGE CT FIRE21-1767 MERIT@BANNER PARKJohnathan Baker
Subject: FIRE21-1767 TR32102 SPK FINAL LOT 19
Location: 29915 BLUE RIDGE CT
Start:
End:
Recurrence:
Meeting Status:
Organizer:
Call Handling Mode 2:
Rep. Name: JUAN
Phone#: 951-358-9783
Thu 3/3/2022 11:00 AM
Thu 3/3/2022 11:30 AM
(none)
Meeting organizer
Johnathan Baker
2
Cell#:
Co. Name: FSS
CrossSt: MERITaBANNER
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/ elocit
Flush
24 hr. batte est /
Final
Sprinkler mdnitoring /
SPRINKLER U.G.
inal %
Thrust block pre -pour
---SPECIAL $OPPRESSION
Underground rough
Door fan test /
Underground hydro
Abort test /
Flush
Mechanica 'shutdown
Final
Detector est
FIRE SPRINKLER
Delu re -action
Weld inspection
Finor
Overhead rough pipin
UST/AST TANK
Overhead hydro
/
nstallation
UG flush / OK to connect
Removal
Main drain/inspect. Test
V
Emergency shut off
High pile storage
\\
Primary piping
In -rack sprinklers
\.
Secondary piping
Hose racks
Dispensers & shear valves
X
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detections stem
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
17
Johnathan Baker
Subject: FIRE21-1767 TR32102 O/H ROUGH/HYDRO LOT 19
Location: 29915 BLUE RIDGE CT
Start: Tue 12/21/2021 3:00 PM
End: Tue 12/21/2021 3:30 PM
Recurrence: (none)
Organizer: Johnathan Baker
Call Handling Mode 2: 2
Rep. Name: JUAN
Phone#: 951-358-9783
Cell#:
Co. Name
FSS
CrossSt: MERIT @ BANNER
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. batte test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Delu a/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emer ency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time:
42