Loading...
29904 BOLIVIAN CT FIRE21-1387 HERITAGE@BANNER PARKJohnathan Baker Subject: Location: Start: End: Recurrence: Meeting Status: Organizer: Call Handling Mode 2: Rep. Name: JUAN Phone#: 951-358-9783 FIRE21-1387 TR32102 SPK FINAL LOT 43 29904 BOLIVIAN CT Tue 12/21/2021 9:00 AM Tue 12/21/2021 9:30 AM (none) Meeting organizer Menifee OFM 2 Co. Name: FSS Cell#: CrossSt: HERITAGE @BANNER HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Under round hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. I.Final Thrust block pre -pour n \ SPECIAL SUPPRESSION Underground rough Door far/test Underground hydro \ ' ,Abort�bst Flush \ Mechanical shutdown Final \ \ Dotector test FIRE SPRINKLER \ ,Deluge/pre-action Weld inspection / ;J Final Overhead rough piping % / \ \I UST/AST TANK Overhead hydro / / \ V i Installation UG flush / OK to connect / / Removal Main drain/Inspect. Test / Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks J Dispensers & shear valves X Final / Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test / Hood/duct extinguishing Gas/Electrical shut-off / High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extin ui hing system T/I final Fire alarm connection Shell final 13 Iliana Gutierrez Subject: FIRE21-1387 TR32102 O/H ROUGH/HYDRO LOT 43 Location: 29904 BOLIVIAN CT Start: Thu 10/7/2021 12:00 PM End: Thu 10/7/2021 12:30 PM Recurrence: (none) Organizer: Menifee OFM Call Handling Mode 2: 2 Rep. Name: HECTOR Phone#: 951-847-2908 Cell#: Co. Name: FSS HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Under round rough Function test Underground hydro Duct detectors/velocitv Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 11