Loading...
29873 JUNIPER CT FIRE22-0134 CREST@BANNERJohnathan Baker Subject: FIRE22-0134 TR32102 SPK FINAL LOT 50 Location: 29873 JUNIPER CT Start: End: Recurrence: Meeting Status: Organizer: Call Handling Mode 2: Rep. Name: JUAN Phone#: 951-358-9783 Thu 4/21/2022 1:00 PM Thu 4/21/2022 1:30 PM (none) Meeting organizer Johnathan Baker 2 Cell#: Co. Name: FSS Grossbt: GRt51 (c_Vt3ANNER NARK HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough- ire inspection Underground rough Function test Underground hydro Duct detectors/velocitv Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan tp§t Underground hydro Abort teO Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Delu a/pre-action Weld inspection Final Overhead rough piping j UST/AST TANK Overhead hydro / Installation UG flush / OK to connect / /' Removal Main drain/Inspect. Test / Emergency shut off High pile storage / Primary piping In -rack sprinklers \ Secondary piping Hose racks \., -./ Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING / MISC. INSPECTION Detection system Spray booths Function Test { Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection I Shell final 11 Johnathan Baker Subject: FIRE22-0134 TR32102 O/H ROUGH/HYDRO LOT 50 Location: 29873 JUNIPER CT Start: Thu 2/10/2022 9:00 AM End: Thu 2/10/2022 9:30 AM Recurrence: (none) Meeting Status: Meeting organizer Organizer: Johnathan Baker Call Handling Mode 2: 2 Rep. Name: HECTOR Phone#: 951-847-2908 Cell#: Co. Name: FSS CrossSt: CREST (WBANNER HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Seconds pipin Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical!shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final E