29838 BLUE RIDGE CT FIRE21-1684 CREST@BANNERJohnathan Baker
Subject:
Location:
Start:
End:
Recurrence:
Meeting Status:
Organizer:
Call Handling Mode 2:
FIRE21-1684 TR32102 SPK FINAL LOT 34
29838 BLUE RIDGE CT
Fri 2/18/2022 2:30 PM
Fri 2/18/2022 3:00 PM
(none)
Meeting organizer
Johnathan Baker
2
Rep. Name: HECTOR
Phone#: 951-847-2908 Cell#.
Co. Name: FSS
1.F05501: k mr-o I %-V CS/HIVIVCr(
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Under round hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
F' al
Thrust block pre -pour
/ SPECIAL SUPPRESSION
Underground rough
oor fan test
Underground hydro
\
Abort test
Flush
\
Mechanical shutdown
Final
\
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
\ \
Final
Overhead rough piping
/
\ ./
UST/AST TANK
Overhead hydro
/
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
J
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
i
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hvdrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
29
Johnathan Baker
Subject: FIRE21-1684 TR32102 O/H ROUGH/HYDRO LOT 34
Location: 29838 BLUE RIDGE CT
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2_
Rep. Name: HECTOR
Phone#: 951-847-2908
Fri 12/3/2021 3:00 PM
Fri 12/3/2021 3:30 PM
(none)
Johnathan Baker
2
Cell#:
Co. Name:
FSS
CrossSt: CREST @BANNER
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battea test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
x
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emer ency shut off
High pile storage
Primary piping
In-racksprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detections stem
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extin uishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupant
Start
Time:
Finish Time:
Start Time:
Finish Time:
17