Loading...
29838 BLUE RIDGE CT FIRE21-1684 CREST@BANNERJohnathan Baker Subject: Location: Start: End: Recurrence: Meeting Status: Organizer: Call Handling Mode 2: FIRE21-1684 TR32102 SPK FINAL LOT 34 29838 BLUE RIDGE CT Fri 2/18/2022 2:30 PM Fri 2/18/2022 3:00 PM (none) Meeting organizer Johnathan Baker 2 Rep. Name: HECTOR Phone#: 951-847-2908 Cell#. Co. Name: FSS 1.F05501: k mr-o I %-V CS/HIVIVCr( HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Under round hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. F' al Thrust block pre -pour / SPECIAL SUPPRESSION Underground rough oor fan test Underground hydro \ Abort test Flush \ Mechanical shutdown Final \ Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection \ \ Final Overhead rough piping / \ ./ UST/AST TANK Overhead hydro / Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage J Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final i Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hvdrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final 29 Johnathan Baker Subject: FIRE21-1684 TR32102 O/H ROUGH/HYDRO LOT 34 Location: 29838 BLUE RIDGE CT Start: End: Recurrence: Organizer: Call Handling Mode 2_ Rep. Name: HECTOR Phone#: 951-847-2908 Fri 12/3/2021 3:00 PM Fri 12/3/2021 3:30 PM (none) Johnathan Baker 2 Cell#: Co. Name: FSS CrossSt: CREST @BANNER HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battea test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping x UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emer ency shut off High pile storage Primary piping In-racksprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detections stem Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extin uishing system T/I final Fire alarm connection Shell final Final Final for occupant Start Time: Finish Time: Start Time: Finish Time: 17