29836 JUNIPER CT FIRE22-0123 MERIT@BANNERJohnathan Baker
Subject: FIRE22-0123 TR32102 SPK FINAL LOT 54
Location: 29836 JUNIPER CT
Start:
End:
Recurrence:
Meeting Status:
Organizer:
Call Handling Mode 2:
Rep. Name
Phone#:
JUAN
Thu 4/21/2022 2:30 PM
Thu 4/21/2022 3:00 PM
(none)
Meeting organizer
Johnathan Baker
K
951-358-9783 Cell#:
Co. Name
FSS
LZOSSSt: MERI I (C_013ANNER PARK
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
\.
Abort test
Flush
Mechanical shutdown
Final
Detector te;rf
FIRE SPRINKLER
Delu e/pKe-action
Weld inspection
C
\
Final/
Overhead rough piping
i
UST/AST TANK
Overhead hydro
4ristallation
UG flush / OK to connect
/
Removal
Main drain/Inspect. Test
/ /
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
, '
Secondary piping
Hose racks
\
i
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
31
Johnathan Baker
Subject: FIRE22-0123 TR32102 O/H ROUGH/HYDRO LOT 54
Location: 29836 JUNIPER CT
Start: Thu 2/10/2022 9:30 AM
End: Thu 2/10/2022 10:00 AM
Recurrence: (none)
Meeting Status: Meeting organizer
Organizer: Johnathan Baker
Call Handling Mode 2: 2
Rep. Name: JUAN
Phone#: 951-358-9783
Cell#:
Co. Name: FSS
CrossSt: MERIT aBANNER
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
j(
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
9