Loading...
29824 JUNIPER CT FIRE22-0126 MERIT@BANNERJohnathan Baker Subject: Location: Start: End: Recurrence: Meeting Status: Organizer: Call Handling Mode 2: FIRE22-0126 TR32102 SPK FINAL LOT 55 29824 JUNIPER CT Thu 4/21/2022 2:30 PM Thu 4/21/2022 3:00 PM (none) Meeting organizer Johnathan Baker 2 Rep. Name: JUAN Phone#: 951-358-9783 Cell#: Co. Name: FSS L.WOSSSt: MtKI I [CVbANNtK F'AKK HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. batte test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Qete'ctor test FIRE SPRINKLER \. "C}46lu a/pre-action Weld inspection Final Overhead rough piping / UST/AST TANK Overhead hydro / Installation UG flush / OK to connect / Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In-racksprinklers \ Secondary piping Hose racks Dispensers & shear valves Final / Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final 29 Iliana Gutierrez Subject: FIRE22-0126 TR32102 O/H ROUGH/HYDRO LOT 55 Location: 29824 JUNIPER CT Start: Thu 2/17/2022 9:00 AM End: Thu 2/17/2022 9:30 AM Recurrence: (none) Meeting Status: Meeting organizer Organizer: Menifee OFM Call Handling Mode 2: 2 Rep. Name: HECTOR Phone#: 951-847-2908 Cell#: Co. Name: FSS CrossSt: MERIT OBANNER HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Under round hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Seconda piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detections stem Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final 7