29730 LAUREL CT FIRE21-0861 CREST@BANNERIliana Gutierrez
Subject: FIRE21-0861 TR32102 SPK FINAL LOT 119
Location: 29730 LAUREL CT
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: HECTOR
Phone#: 951-847-2908
Wed 10/6/2021 2:00 PM
Wed 10/6/2021 2:30 PM
(none)
Sonya Rivera-Bu
2
Cell#:
Co. Name
FSS
CrossSt: CREST @ BANNER
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rou h-wire jrfs ection
Underground rough
Function Xst
Underground hydro
Duct defectors/velocit
Flush
24 Vbattery test
Final
Sorinkler monitoring
SPRINKLER U.G.
final
Thrust block pre -pour
SPECIAL SUPPRESSION
Under round rough
D fan st
Underground hydro
Flush
i
ical shutdown
Final
,�
for test
FIRE SPRINKLER
a/pre-action
Weld inspection
Jtnal
Overhead rough piping
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test /'
Emergency shut off
High pile storage
Primary piping
In-racksprinklers f
Secondary piping
Hose racks
Dispensers & shear valves
X
Final
A
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occu anc
Start Time:
Finish Time:
Start Time: I
I
Finish Time:
1
(liana Gutierrez
Subject: FIRE21-0861 TR32102 O/H ROUGH/HYDRO LOT 119
Location: 29730 LAUREL CT
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: HECTOR
Phone#: 951-847-2908
Mon 8/16/2021 10:30 AM
Mon 8/16/2021 11:00 AM
(none)
Steven Fox
2
Cell#:
Co. Name:
FSS
UFUtibOU k mr-0I tQJ CSHIVIVtK
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Under round hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detections stem
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time:
25