29435 BAY BERRY ST FIRE21-1449 CREST@BANNERIliana Gutierrez
Subject: FIRE21-1449 TR32102 SPK FINAL LOT 7
Location: 29435 BAY BERRY ST
Start:
End:
Recurrence:
Meeting Status:
Organizer:
Call Handling Mode 2:
Rep. Name: JUAN
Phone#: 951-358-9783
Tue 1/25/2022 10:00 AM
Tue 1/25/2022 10:30 AM
(none)
Meeting organizer
Menifee OFM
2
Co. Name
Cell#:
FSS.
CrossSt: CREST@BANNER
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function te,
Underground hydro
Duct det "tors/velocit
Flush
24 hr. Oftery test
Final
SprirAler monitoring
SPRINKLER U.G.
Fip'aI
Thrust block pre -pour
/ SPECIAL SUPPRESSION
Underground rough
/
Door fan test
Underground hydro
r
Abort test
Flush
/
Mechanical shutdown
Final
/
tector test
FIRE SPRINKLER
/ ,
,. elu e/ re -action
Weld inspection
.-
Final
Overhead rough piping
►
UST/AST TANK
Overhead hydro
/
Installation
UG flush / OK to connect
Removal
Main drain/inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondwy piping
Hose racks
Dispensers & shear valves
X
Final
Final
KITCHEN HOOD EXTINGU HING
MISC. INSPECTION
Detections stem
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing,system
T/I final
Fire alarm connection
Shell final
21
Johnathan Baker
Subject:
FIRE21-1449 TR32102 O/H ROUGH/HYDRO LOT 7
Location:
29435 BAY BERRY ST
Start:
Thu 11/4/2021 11:30 AM
End:
Thu 11/4/2021 12:00 PM
Recurrence:
(none)
Organizer:
Menifee OFM
Call Handling Mode 2:
2
Rep. Name: HECTOR
Phone#: 951-847-2908
Cell#:
Co. Name: FSS
VI VJJJL. IiRCJ 1 `L.0 L)MIVIVCr[
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergencv shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start
Time:
Finish Time:
Start Time:
Finish Time:
21