Loading...
29435 BAY BERRY ST FIRE21-1449 CREST@BANNERIliana Gutierrez Subject: FIRE21-1449 TR32102 SPK FINAL LOT 7 Location: 29435 BAY BERRY ST Start: End: Recurrence: Meeting Status: Organizer: Call Handling Mode 2: Rep. Name: JUAN Phone#: 951-358-9783 Tue 1/25/2022 10:00 AM Tue 1/25/2022 10:30 AM (none) Meeting organizer Menifee OFM 2 Co. Name Cell#: FSS. CrossSt: CREST@BANNER HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function te, Underground hydro Duct det "tors/velocit Flush 24 hr. Oftery test Final SprirAler monitoring SPRINKLER U.G. Fip'aI Thrust block pre -pour / SPECIAL SUPPRESSION Underground rough / Door fan test Underground hydro r Abort test Flush / Mechanical shutdown Final / tector test FIRE SPRINKLER / , ,. elu e/ re -action Weld inspection .- Final Overhead rough piping ► UST/AST TANK Overhead hydro / Installation UG flush / OK to connect Removal Main drain/inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondwy piping Hose racks Dispensers & shear valves X Final Final KITCHEN HOOD EXTINGU HING MISC. INSPECTION Detections stem Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing,system T/I final Fire alarm connection Shell final 21 Johnathan Baker Subject: FIRE21-1449 TR32102 O/H ROUGH/HYDRO LOT 7 Location: 29435 BAY BERRY ST Start: Thu 11/4/2021 11:30 AM End: Thu 11/4/2021 12:00 PM Recurrence: (none) Organizer: Menifee OFM Call Handling Mode 2: 2 Rep. Name: HECTOR Phone#: 951-847-2908 Cell#: Co. Name: FSS VI VJJJL. IiRCJ 1 `L.0 L)MIVIVCr[ HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergencv shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 21