Loading...
2022-04-20 City Council Item No. 4.1 CIP Workshop for Fiscal Year 2022/2023 Special MEETING - Additional Meeting MaterialsFY 2022-23 Capital Improvement Program Workshop #2 Nick Fidler, Public Works DirectorJonathan Nicks, Community Services DirectorCarlos Geronimo, Principal EngineerApril 20, 2022 1 CIP Workshop #2 Overview 2 Workshop #1 Input Summary Proposed FY 22-23 Project List by type Proposed FY 22-23 Project Details CIP Budget Schedule April 6th CIP Workshop #1 April 20th CIP Workshop #2 May 4th Council Budget Workshop May 11th CIP Budget to Planning Commission June 1st CIP Budget Adoption FY 23 CIP Workshop #1 Input Summary Staff reorganized project priority based on input received from Workshop #1 Provided available funding sources Added projects proposed by Council and staff 4 FY 21-22 CIP Summary 13 Completed Projects worth $9,496,083 •1 Traffic Signal•3 Street Improvements•3 PMP Projects•2 Public Facilities •4 Parks, Trails, and Recreation Projects 35 Projects in Design –Estimated at $14,111,742•9 Transportation Projects•1Traffic Signal•7 Street Improvements•4 PMP Projects•8 Public Facility •6 Parks, Trails, and Recreation Projects 7 Projects under Construction –Estimated at $4,983,279•4 Traffic Signals•3 PMP Projects 5 42 Active Projects FY 22-23 Proposed Projects 6 FY 22-23 Proposed Projects 7 Project Number Project Name Approved Funding To-Date FY 22-23 Request C I P 13 - 0 3 Holland Road Overpass $35,192,225 $223,336 C I P 13 - 0 4 Bradley Bridge Over Salt Creek $3,434,294 $5,705,366 CIP 22-02 Valley Boulevard Widening and Missing Links $1,300,000 $1,730,000 CIP 22-03 McCall Boulevard Widening $2,517,000 $508,647 CIP 22-04 Bailey Park Boulevard Widening $1,107,000 $659,417 PW-TR-01 Murrieta Bridge over Salt Creek new $1,800,000 PW-TS-17 Goetz Road/Vista Way Traffic Signal $122,500 PW-TS-19 Menifee Road / FS 76 Entrance Traffic Signal new $ 18 1, 7 0 1 CIP 22-08 Normandy Road Pedestrian Improvements $410,000 $150,000 PW- I M P- 11 ATP- Romoland Grid Area 3rd Street new $222,550 PW-IMP-25 Bradley Road Widening near Paloma High School Northern Entrance $128,076Transportation Traffic SignalsStreet Improvements FY 22-23 Proposed Projects cont’d 8 Project Number Project Name Approved Funding To-Date FY 22-23 Request South East Communities Resurfacing (south of Wickerd Road) new Brigata Community Slurry Seal new Lake Ridge Slurry Seal new CIP 22-23 Romoland Grid Neighborhood (South) new $ 18 4 , 117 $815,883 PW-PMP-09 Willows Neighborhood new $710,000 PW-PMP-06 Casablanca Community Resurfacing new $1,000,000 C I P 19 - 0 2 Murrieta Road Resurfacing (Salt Creek to San Quintin Road) new $1,701,568 Street LightsPW-SL-02 Quail Grid Valley Area $100,000 C I P 2 1- 0 4 New Fire Station #5 $7,070,000 $700,000 C I P 2 1- 0 5 New Menifee City Hall $4,000,000 $1,000,000 CS048 Community Center/Recreation Center Project $263,000 C I P 17 - 0 1 Evans Park Design and Construction $ 1, 3 0 6 , 13 8 $200,000 CS007 Park Amenity Enhancements (Various)$225,000 $75,000 CS021 Parking Lot Resurfacing (L. Peterson)$100,000 $200,000 CS053 Fence and Safety Enhancement (Various) new $75,000Public Facility Parks, Trails, and Recreation FY 22-23 Slurry Seal Program $56,959 PMP FY 22-23 Proposed Project Summary 22 Proposed Projects estimated at $18,329,003reflecting the following: 6 Transportation Projects -$10,626,766 2 Traffic Signals -$304,201 3 Street Improvements -$500,626 7 PMP Projects -$4,284,410 1 Street Light Project -$100,000 3 Public Facility Projects -$1,963,000 4 Parks, Trails, and Recreation Projects -$550,000 9 FY 22-23 Projected Revenues and Fund Balance 10 Brigata Community Resurfacing Lake Ridge Community Slurry Seal Southeast Communities Resurfacing FS 001 Fuel Station 750,000$ 540,000$ 250,000$ 200,000$ 90,000$ 540,000$ 210,000$ FS 005 Council Chambers Window Upgrades 200,000$ 200,000$ 200,000$ 200,000$ -$ FS 002 Police Station Upgrade/FS 003 Police Station Upgrades 640,000$ 400,000$ 300,000$ 100,000$ 400,000$ 240,000$ TOTAL 1,590,000$ 1,140,000$ 250,000$ 300,000$ 200,000$ 90,000$ 300,000$ 1,140,000$ 450,000$ Project With Approved Funding Proposed Projects Total Remaining Amount Amount Approved To- Date Amount Requesting to Reallocate FY 22-23 Slurry Seal ProgramFY 22-23 On- Call AC Resurfacing Fire Station 76/Menifee Road Traffic Signal FY 22-23 Proposed Projects: Transportation 11 12 5-Year CIP: Transportation PRIORITY LEVEL PROJECT #PROJECT NAME Status 1 CIP 13-03 *Holland Road Overpass Design 1 CIP 13-04 *Bradley Road Bridge over Salt Creek Design 1 CIP 14-01 McCall Boulevard / I-215 Interchange Design 1 CIP 20-01 *Scott Road / Bundy Canyon Road Widening Design 1 CIP 22-02 *Valley Boulevard Widening and Missing Links Design 1 CIP 22-03 *McCall Boulevard Widening Design 1 CIP 22-04 *Bailey Boulevard Widening Design 2 PW-TR-01 Murrieta Bridge over Salt Creek Preliminary Engineering 2 CIP 20-05 Garbani Road / I-215 Interchange Design 2 CIP 20-13 Paloma Wash Pedestrian Bridge Design 2 PW-TR-02 Menifee Road Widening (Scott-Garbani)Design 2 CIP 22-13 Briggs Road (Garbani Road to Loretta Avenue) Preliminary Engineering *Projects recommended for funding in FY 22/23 CIP 13-03 Holland Road Overpass 13 Scope: Construction of a four-lane bridge over the I- 215 which will include dedicated bike lanes, sidewalks, traffic signals at Haun Rd. and Hanover Rd., lighting, signing and striping. FY 22-23 Request: $223,336 Proposed Fund #2022-23 2 10 0 General Fund 2,800,000$ -$ $ 10 5 Quality of Life Measure 4,339,277$ -$ $ 301 Grants 500,000$ -$ $ 3 10 TUMF 8,255,000$ -$ $ 320 Capital Projects 4,685,817$ 223,336$ $ 4 15 Quality of Life Measure 9,405,011$ -$ $ 509 DIF 17 - Roads 2,755,744$ -$ $ 5 10 DIF 17 - Signals 241,797$ -$ $ 526 DIF Citywide - Circulation 1,723,638$ -$ $ 527 DIF Citywide - Storm Drain Facilit 485,941$ -$ $ 35,192,225$ 223,336$ $ Approved Funding to date TOTALS Fund Name Fund Source CIP 13-04 Bradley Bridge Over Salt Creek 14 Scope: Construction of a bridge over the Salt Creek Channel with capacity for four lanes replacing the existing at grade two-lane road. The project will also construct sidewalks, relocate utilities, and improve drainage. FY 22-23 Request: $5,705,366 Proposed Fund #Fund Name 2022-23 20 10 5 Quality of Life Measure 968,255$ -$ $ 220 Measure A 558,721$ -$ $ 301 Grants -$ -$ 5$ 320 Capital Projects -$ 3,245$ $ 509 DIF 17 - Roads 1,012,969$ 13 2 , 12 1$ $ 520 DIF Citywide - Public Use & Comm. Fac.-$ -$ $ 526 DIF Citywide - Circulation 894,349$ 2,970,000$ $ 527 DIF Citywide - Storm Drain Facilities -$ 600,000$ $ Other: Riverside County Flood Control -$ 2,000,000$ $ UNFUNDED -$ -$ $ 3,434,294$ 5,705,366$ 5$ Fund Source Approved Funding to date TOTALS CIP 22-02 Valley Boulevard Widening and Missing Links 15 Scope: Construction of a 4-lane road and two uncompleted sections of Valley Boulevard between Murrieta Road and Chambers Avenue. In addition, the project will also install Traffic Signals, street lighting, sidewalks, and ADA ramps. FY 22-23 Request: $1,730,000 Proposed Fund #2022-23 20 10 5 Quality of Life Measure -$ -$ $ 220 Measure A -$ -$ $ 4 15 Menifee Valley RBBD -$ 1,000,000$ $ 526 DIF Citywide - Circulation 1,300,000$ 730,000$ $ 527 DIF Citywide - Storm Drain Facilities -$ -$ $ UNFUNDED -$ -$ $ 1,300,000$ 1,730,000$ $ TOTALS Fund Name Fund Source Approved Funding to date CIP 22-03 McCall Boulevard Widening 16 Scope: Widening the existing two-lane road to four lanes including a 12' center median. The project will also relocate utilities, install sidewalks and ADA ramps, and modify two existing traffic signals. FY 22-23 Request: $508,647 Proposed Fund #2022-23 2 10 5 Quality of Life Measure -$ -$ $ 220 Measure A -$ 500,000$ $ 3 10 TUMF 2,517,000$ -$ $ 320 Capital Projects -$ 8,647$ $ UNFUNDED -$ -$ $ 2,517,000.00$ 508,647$ $ TOTALS Fund Source Approved Funding to date Fund Name CIP 22-04 Bailey Park Boulevard Widening 17 Proposed Fund #2022-23 20 10 0 General Fund 450,000$ -$ $ 10 5 Quality of Life Measure -$ -$ $ 220 Measure A 657,000$ -$ $ 301 Grants -$ 600,000$ $ 320 Capital Projects -$ 59,417$ $ UNFUNDED -$ -$ 1,107,000$ 659,417$ $ Fund Name TOTALS Fund Source Approved Funding to date Scope: Construction of approximately 1,400 linear feet of industrial collector road, curb and gutter, sidewalks, street lighting, ADA ramps, street lighting and drainage inlets. FY 22-23 Request: $659,417 new PW-TR-01 Murrieta Bridge over Salt Creek 18 Scope: Construction of a 4-lane bridge over the Salt Creek Channel replacing the existing at grade 2-lane road, which currently experience frequent flooding. FY 22-23 Request: $1,800,000 Proposed Fund #2022-23 2 10 5 Quality of Life Measure -$ -$ $ 320 Capital Projects -$ -$ $ 4 15 Menifee Valley RBBD -$ 1,800,000$ $ 526 DIF Citywide - Circulation -$ -$ $ 527 DIF Citywide - Storm Drain Facilities -$ -$ $ UNFUNDED -$ -$ $ -$ 1,800,000$ $ TOTALS Fund Source Approved Funding To Date Fund Name FY 22-23 Proposed Projects: Traffic Signals 19 5-year CIP: Traffic Signals *Projects recommended for funding in FY 22/23 Projects highlighted in greenProject prioritized based on input from Workshop #1 20 PRIORITY LEVEL PROJECT #PROJECT NAME Status 1 CIP 21-07 Menifee Road/La Piedra Road Traffic Signal previously awarded Construction 1 CIP 21-10 Murrieta Road/Rouse Road Traffic Signal previously awarded Construction 1 CIP 21-11 Menifee Road / Garbani Road Traffic Signal previously awarded Construction 1 CIP 22-15 Antelope Road / MSJC Entrance Traffic Signal Design 1 CIP 22-16 Murrieta Road / La Piedra Road Traffic Signal Design 1 PW-TS-12 Menifee Road / Mathews Road Traffic Signal Design 1 PW-TS-17 *Goetz Road / Vista Way Traffic Signal Preliminary Engineering 1 2 PW-TS-02 Hwy 74 / 3rd Street Traffic Signal Preliminary Engineering 2 PW-TS-03 Hwy 74 / Tradewinds Traffic Signal Preliminary Engineering 2 PW-TS-07 Murrieta Road / Chambers Road Traffic Signal Preliminary Engineering 2 PW-TS-18 Briggs Road / Garbani Road Traffic Signal Preliminary Engineering proposed PW-TS-19 *Menifee Road/ Fire Station No. 76 Entrance Traffic Signal Preliminary Engineering PW-TS-17 Goetz Road/Vista Way Traffic Signal 21 Scope: Installation of a new traffic signal at Vista Way and Goetz road, the widening of the roadway to include left-turn pockets and signing and striping where appropriate. FY 22-23 Request: $122,500 for design Proposed Enhancements Proposed Fund #2022-23 20 220 Measure A -$ -$ $ 526 DIF Citywide - Circulation -$ 122,500$ $ 460 CSA 86 -$ -$ $ UNFUNDED -$ -$ $ -$ 122,500$ $ TOTALS Fund Source Approved Funding to Fund Name Proposed Fund #2022-23 20 10 5 Quality of Life Measure -$ 300,000$ $ 521 DIF Citywide - Fire Facilities -$ 18 1, 70 1$ $ UNFUNDED -$ -$ $ -$ 481,701$ $ TOTALS Fund Source Approved Funding to Fund Name PW-TS-19 Menifee Road/Fire Station No. 76 Entrance Traffic Signal Scope: Installation of a three-way traffic signal on Menifee Road and the entrance of Fire Station No. 76 due to poor line of sight onto oncoming traffic on Menifee Road as they exit the fire station to respond to emergencies FY 22-23 Request: $481,701 Recommendation: Reallocate $300,000 from Police Station Upgrades 22 *Proposed FY 22-23 Proposed Projects: Street Improvements 23 5-Year CIP: Street Improvements *Projects recommended for funding in FY 22/23 Projects highlighted in greenProject prioritized based on input received from Workshop #1 PRIORITY LEVEL PROJECT #PROJECT NAME Status 1 CIP 22-08 *Normandy Road Pedestrian Improvements Design 1 CIP 22-14 HSIP -Newport Road Raised Medians (Murrieta Rd to Bradley Rd)Design 1 CIP 22-28 Beth Drive Street Improvement (Murrieta Road to Melvin Street)Design 1 PW-IMP-11 *ATP -Romoland Grid Area (North of Hwy 74)Design 1 proposed PW-IMP-24 *Bradley Road Widening near Paloma High School North Entrance Preliminary Engineering 2 PW-IMP-02 Lindenberger Road -Sidewalk Improvements Preliminary Engineering 2 PW-IMP-04 HSIP -Menifee Road (Hwy 74 to City Limits)Preliminary Engineering 2 PW-IMP-05 HSIP -Menifee Road (McCall Blvd to Hwy 74)Preliminary Engineering 2 PW-IMP-06 HSIP -McCall Blvd. (Encanto Dr. to Menifee Rd.)Preliminary Engineering 2 PW-IMP-07 HSIP -Sun City Blvd. (Manchester Dr. to Cherry Hills Blvd.)Preliminary Engineering 2 PW-IMP-12 ATP -La Piedra Road at Bell Mountain Middle School Design 2 4 PW-IMP-20 Interchange Beautification -Newport Road Preliminary Engineering 24 CIP 22-08 Normandy Road Pedestrian Improvements 25 Scope: Installation of pedestrian and bicycle trail facilities by widening the existing road on the north side. FY 22-23 Request: 150,000 Proposed Fund #2022-23 2 100 General Fund 30,000$ -$ $ 105 Quality of Life Measure 220,000$ -$ $ 220 Measure A 160,000$ 100,190$ $ 320 Capital Projects -$ 49,810$ $ 410,000.00$ 150,000$ $ Fund Source Approved Funding to date Fund Name TOTALS new PW-IMP-11 ATP -Romoland Grid Area 3rd Street 26 Scope: Widening of existing road shoulder, addition of curb and gutter, sidewalks, pedestrian ADA ramps, and high visibility crosswalks FY 22-23 Request: $222,550 Proposed Fund #2022-23 20 10 5 Quality of Life Measure -$ -$ $ 201 RMRA (SB1)-$ -$ $ 220 Measure A -$ -$ $ 481 CDBG -$ 222,550$ $ UNFUNDED -$ -$ $ -$ 222,550$ $ TOTALS Fund Source Approved Funding to date Fund Name PW-IMP-25 Bradley Road Widening near Paloma HS Northern Entrance 27 Scope: This project will widen the east side of Bradley Road from Corson Avenue to the south side of Meadow Run Community. The project will include sidewalks and ADA accessible ramps for safe route to school FY 22-23 Request: $128,076 Proposed Fund #2022-23 20 750 CFD 2019-1 Meadow Run -$ 128,076$ $ UNFUNDED -$ -$ $ -$ 128,076$ $ TOTALS Fund Source Approved Funding to date Fund Name FY 22-23 Proposed Projects: PMP 28 5-Year CIP: PMP *Projects recommended for funding in FY 22/23 Projects highlighted in greenProject prioritized based on input received from Workshop #1 29 PRIORITY LEVEL PROJECT #PROJECT NAME Status 1 CIP 21-17 Peacock Place Community Resurfacing Construction 1 CIP 22-06 Menifee Rd Resurfacing and Median Improvements -Holland Rd to Newport Road Design 1 CIP 22-07 Tradewinds Community (Romoland north of Hwy 74)Construction 1 CIP 22-23 *Romoland Grid Neighborhood (South)Design 1 PW-PMP-07 Menifee Meadows Neighborhood (East of Bradley and South of La Piedra)Construction 1 PW-PMP-10 Neighborhood East of Bradley from Potomac Rd to El Rancho (Sun City)Construction 1 2 PW-PMP-06 *Casa Blanca Villas Neighborhood (south of McCall)Preliminary Engineering 1 2 PW-PMP-08 Lake Ridge Estates Neighborhood AC Resurfacing (Menifee Lakes) Preliminary Engineering 1 2 PW-PMP-11 *Murrieta Road Resurfacing -San Quintin to Salt Creek Preliminary Engineering 1 *FY 22-23 On-Call AC Resurfacing new 1 4 PW-PMP-09 *Willows Neighborhood (Menifee Lakes) Preliminary Engineering 1 proposed FY 22-23 Slurry Seal Program *Brigata Community Slurry Seal Preliminary Engineering *Lake Ridge Slurry Seal Preliminary Engineering *South East Communities Resurfacing (south of Wickerd Road)Preliminary Engineering new CIP 22-23 Romoland Grid Neighborhood (South) 30 Scope: Resurfacing of the existing road , upgrading existing curb ramps to current ADA standards, and restriping to match existing road. FY 22-23 Request: $815,883 Proposed Fund #2022-23 20 10 5 Quality of Life Measure 18 4 , 117$ -$ $ 200 Gas Tax -$ -$ $ 220 Measure A -$ 815,883$ $ 18 4 , 117. 0 0$ 815,883$ $ TOTALS Fund Source Approved Funding to date Fund Name new PW-PMP-06 Casa Blanca Villas Community Resurfacing 31 Scope: Resurfacing the existing road , upgrading existing curb ramps to current ADA standards, and restriping to match existing road. FY 22-23 Request: $1,000,000 Proposed Fund #2022-23 20 10 0 General Fund -$ -$ $ 201 RMRA (SB1)-$ 548,000$ $ 220 Measure A -$ 452,000$ $ -$ 1,000,000$ $ Fund Source Approved Funding to date Fund Name TOTALS new PW-PMP-11 Murrieta Road Resurfacing 32 Scope: Rehabilitation of the existing pavement with Cold Recycling-In-Place technology, minor shoulder widening, pedestrian ADA ramps, retrofitting, signing, striping, and minor storm drain improvements FY 22-23 Request: $1,701,568 Proposed Fund #2022-23 20 10 5 Quality of Life Measure -$ -$ $ 201 RMRA (SB1)-$ 1,700,000$ $ 320 Capital Projects -$ 1,568$ $ -$ 1,701,568$ $ Fund Source Approved Funding to date Fund Name TOTALS new PW-PMP-09 Willows Neighborhood (Menifee Lakes) 33 Scope: Resurfacing of the existing road , upgrading existing curb ramps to current ADA standards, and restriping to match existing road. FY 22-23 Request: $710,000 Proposed Fund #2022-23 20 201 RMRA (SB1)-$ 667,000$ $ 220 Measure A -$ 43,000$ $ UNFUNDED -$ -$ $ -$ 710,000$ $ Fund Source Approved Funding to date Fund Name TOTALS Proposed FY 22-23 On-Call AC Resurfacing at Various Locations Existing Conditions Abbey Lane Existing Conditions Sherman Road Fund Source Approved Funding To-Date Proposed Fund #Fund Name 2022-23 100 General $ -$ 250,000 TOTALS $ -$ 250,000 Scope: On-Call pavement repair City-wide FY 22-23 Request: $250,000 *Recommendation: Reallocate $250,000 from Fuel Station Project Existing Conditions Scott Road Existing Conditions Simpson Road 34 *Proposed proposed Brigata Community Slurry Seal FY 22-23 Slurry Seal Program 35 Scope: Slurry Seal of existing roadway and restriping FY 22-23 Request: $200,000 *Recommendation: Reallocate $200,000 from Fuel Station Project Fund Source Approved Funding To-Date Proposed Fund #Fund Name 2022-23 *100 General $ -$ 200,000 TOTALS $ -$ 200,000 *Proposed proposed Lake Ridge Community Slurry Seal FY 22-23 Slurry Seal Program 36 Scope: Slurry Seal of existing roadway and restriping FY 22-23 Request: $146,959 *Recommendation: Reallocate $90,00 from Fuel Station Project Fund Source Approved Funding To- Date Proposed Fund #Fund Name 2022-23 *100 General $ -$ 90,000 *220 Measure A $ 56,959 TOTALS $ -$ 146,959 *Proposed new Southeast Communities Resurfacing FY 22-23 Slurry Seal Program 37 Scope: Slurry Seal of existing roadway and restriping FY 22-23 Request: $300,000 *Recommendation: Reallocate $200,000 from Council Chambers Window Upgrade Project and $100,000 from Police Station Upgrade Project Fund Source Approved Funding To-Date Proposed Fund #Fund Name 2022-23 *100 General $ -$ 200,000 *105 Quality of Life $ -$ 100,000 TOTALS $ -$ 300,000 *Proposed FY 22-23 Proposed Projects: Street Lights 38 5-Year CIP: Street Light Projects PRIORITY LEVEL PROJECT #PROJECT NAME Status 1 2 PW-SL-02 *Quail Valley Grid Area Preliminary Engineering 2 PW-SL-01 Romoland Grid Area (North of Hwy 74)Preliminary Engineering 3 CIP 22-18 Vista Way and Casa Bonita Drive Preliminary Engineering *Projects recommended for funding in FY 22/23 Projects highlighted in greenProject prioritized based on input received from Workshop #1 39 PW-SL-02 Quail Grid Valley Area 40 Proposed Fund #2022-23 2 10 5 Quality of Life Measure -$ -$ $ 460 CSA 86 -$ 100,000$ $ UNFUNDED -$ -$ $ -$ 100,000$ $ Fund Source Approved Funding to date Fund Name TOTALS Scope: Pilot Program to Install Solar-Powered Street Lights at key locations (intersections and cluster mailbox locations) in the Quail Valley Area FY 22-23 Request: $100,000 FY 22-23 Proposed Projects: Public Facilities 41 5-Year CIP: Public Facilities PRIORITY LEVEL PROJECT #PROJECT NAME Status 1 CIP 21-03 Fire Station # 68 Interior Improvements Design 1 CIP 21-04 *New Fire Station #5 Design 1 PW-BLD-02 Menifee Central Police HQ Preliminary Engineering 1 F-002 Police Station Parking Lot Upgrades Preliminary Engineering 1 F-004 Park & Facility Multi-Use Trailers Preliminary Engineering 1 CIP 22-05 CIP 22-05 Council Chambers A/V Improvements Completed 1 CIP 22-24 Civic Center Parking Lot Preliminary Engineering 1 CIP 21-05 *New Menifee City Hall Preliminary Engineering 1 CS048 *Community Center at La Piedra Road Preliminary Engineering 2 F-003 Police Station Upgrades (Wall, Carport, Lighting)Preliminary Engineering 2 F-005 Council Chambers Window Upgrade Preliminary Engineering 2 4 PW-BLD-04 New 5th Station (Northerly Area)Preliminary Engineering 3 1 F-001 Fuel Station Preliminary Engineering *Projects recommended for funding in FY 22/23 Projects highlighted in greenChanges in priority level based on input received from Workshop #1 42 CIP 21-04 New Fire Station #5 43 Scope: Building a new facility at a vacant lot on Goetz Road south of Vista Way to replace Fire Station #5 FY 22-23 Request: $700,000 Proposed Fund #2022-23 20 10 5 Quality of Life Measure 3,453,433$ -$ $ 508 DIF 17 - Fire 3,174,041$ -$ $ 521 DIF Citywide - Fire Facilities 442,526$ 700,000$ $ 7,070,000$ 700,000$ $ TOTALS Fund Source Approved Funding to date Fund Name CS048 Community Center/Recreation Center Project 44 Scope: The County of Riverside completed a new public library on La Piedra and Menifee Road in 2021. The County library facility only utilized approximately 2 acres of the approximate 6 acre site. The County has had discussions with the City about providing the additional undeveloped land for a future community center. If the undeveloped land is transferred to the City from the County, this project will design and construct a new City community center. FY 22-23 Request: $263,000 Fund Source Approved Funding To-Date Proposed Fund #Fund Name 2022-23 100 General Fund $ 1,000,000 $ - 520 DIF Citywide -Public Use & Comm. Fac.$ -$ 263,000 UNFUNDED $ -$ - TOTALS $ 1,000,000 $ 263,000 CIP 21-05 New Menifee City Hall 45 Scope: The new Menifee City Hall will comprise of a 69,000 sq. ft., 2-story building with surface parking ratio of 4/1000 sq. ft. The new building will be designed for sustainable zero-net energy footprint with LEED Gold Certification, and the new City Council Chambers will have broadcasting capabilities. FY 22-23 Request: $1,000,000 Fund Source Approved Funding To-Date Proposed Fund #Fund Name 2022-23 100 General Fund $ 4,750,000 $ - 524 Citywide Facility/ Software/Vehicle/Equip $ -$ 1,000,000 UNFUNDED $ -$ - TOTALS $ 4,750,000 $ 1,000,000 FY 22-23 Proposed Projects: Parks, Trails, and Recreation 46 5-Year CIP: Parks, Trails, and Recreation Projects PRIORITY LEVEL PROJECT #PROJECT NAME Status 1 CIP 17-01 *Evans Park Design/Construction Design 1 CS021 *Parking Lot Resurfacing and Trash Enclosures (E.L. Peterson Park)Preliminary Engineering 1 CS052 AMR Skate Park Improvements Preliminary Engineering 1 CS007 *Park Amenity Enhancements Preliminary Engineering 1 proposed CS053 *Fence and Safety Enhancements Preliminary Engineering 2 CS014 Park Lighting Preliminary Engineering 2 CS042 Sports Court Resurfacing Preliminary Engineering 2 CS047 (21-06)Shade Structures Preliminary Engineering 2 CS049 Salt Creek Trail Parking Preliminary Engineering 2 CS051 Salt Creek Trail Improvements Preliminary Engineering 3 CS029 Utility Corridor Trail Preliminary Engineering 3 4 CS031 Park Land Acquisition Preliminary Engineering *Projects recommended for funding in FY 22/23 Projects highlighted in greenChanges in priority level based on input received from Workshop #1 47 CIP 17-01 Evans Park Design and Construction 48 Scope: Phased improvements at Evans Park. Phase 1 included design and construction of a pump track and bike trails, and phase 2 will include design and construction of the larger parcel adjacent to the high school for multi-use sports fields, gym, playground, splashpad, pickleball, and tennis court FY 22-23 Request: $200,000 Fund Source Approved Funding To-Date Proposed Fund #Fund Name 2022-23 511 DIF 17 -Parks $ 400,000 $ - 512 DIF 17 -Trails $ 300,000 $ - 522 DIF Citywide -Park Improvements $ 550,000 $ 200,000 620 Local Park (Quimby)$ 56,138 $ - 622 CFD 2015-2 Citywide Parks $ -$ - UNFUNDED $ -$ - TOTALS $ 1,306,138 $ 200,000 CS007 Park Amenity Enhancements (Various) 49 Scope: Amenity repair and replacement of city- maintained parks for playground equipment, exercise equipment, picnic tables, park benches, trach and coal receptacles, and dog waste bag dispensers FY 22-23 Request: $75,000 Proposed Enhancements Proposed Enhancements Fund Source Approved Funding To-Date Proposed Fund #Fund Name 2022-23 490 CFD 2012-1 Audie Murphy Ranch $ -$ 75,000 620 Local Park (Quimby)$ 225,000 $ - UNFUNDED $ -$ - TOTALS $ 225,000 $ 75,000 CS021 Park Parking Lot Resurfacing (Petersen Park) 50 Scope: Improvements to the parking lot of E.L. Petersen Park through slurry seal, curb/gutter, and striping. FY 22-23 Request: $200,000 Existing Conditions Existing Conditions Fund Source Approved Funding To- Date Proposed Fund #Fund Name 2022-23 507 DIF 17 -Public Facilities $ 100,000 $ - 620 Local Park (Quimby)$ -$ 200,000 TOTALS $ 100,000 $ 200,000 CS053 Fence and Safety Enhancements(Various) 51 Scope: Installation of safety fencing around inclusive playgrounds and outfield sport fields at various locations FY 22-23 Request: $75,000 Fund Source Approved Funding To-Date Proposed Fund #Fund Name 2022-23 622 CFD 2015-2 Citywide Parks $ -$ 75,000 TOTALS $ -$ 75,000 Existing Conditions Proposed Enhancements Questions? 52