Loading...
29835 LAREDO CIR FIRE21-1472 COMPASS(liana Gutierrez Subject: Location: Start: End: Recurrence: Meeting Status: Organizer: Call Handling Mode 2: Rep. Name: JUAN Phone#: 951-358-9783 FIRE21-1472 TR31822 SPK FINAL LOT 69 29835 LAREDO CIR Wed 1/26/2022 12:30 PM Wed 1/26/2022 1:00 PM (none) Meeting organizer Menifee OFM 2 Co. Name Cell#: FSS LwoSszm: UUMh'ASJ HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Under round rough Function test Underground hydro Duct detectors/velocity Flush / 24 hr. battery test Final O Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour , SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush ONJ echanical shutdown Detector test Final FIRE SPRINKLER / Delu a/pre-action Weld inspection / Final Overhead rough piping UST/AST TANK Overheadhydro dro / Installation UG flush / OK to connect I Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves X Final Final KITCHEN H000 EXTINGUISHING MISC. INSPECTION Detection s ste{n Spray booths Function Tesy Hood/duct extinguishing Gas/Electri.dal shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/h drant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final 7 Jade Mumme Subject: FIRE21-1472 TR31822 O/H ROUGH/HYDRO LOT 69 Location: 29835 LAREDO CIRCLE Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name.- JUAN Phone#: 951-358-9783 Fri 10/22/2021 2:30 PM Fri 10/22/2021 3:00 PM (none) Menifee OFM 2 Cell#: Co. Name FSS CrossSt: COMPASS HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Under round rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation BuildingKnox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: I Finish Time: i