29394 WESTWARD CIR FIRE21-0705 COMPASSMaria Gutierrez
Subject:
Location:
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: HECTOR
Phone#: 951-847-2908
FIRE21-0705 TR31822 SPK FINAL LOT 25
29394 WESTWARD CIRCLE
Tue 8/10/2021 1:00 PM
Tue 8/10/2021 1:30 PM
(none)
Menifee OFM
2
Cell#:
Co. Name: FSS
CrossS�: COMPASS
HYDRANT SYSTEM
PASS
FAIL
FIRE ARM
PASS
FAIL
Thrust block pre -pour
Rough -wire i ection
Under round rough
Function twff
Under round hydro
Duct de ctors/velocit
Flush
24 hrAaftery test
Final
Sgfnkler monitoring
SPRINKLER U.G.
nal
Thrust block pre -pour
KSPECIAL SUPPRESSION
Under round rough
0
1
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
'%ateAlor test
FIRE SPRINKLER
A
1LOP§ffg2/pre-action
Weld inspection
=inal
Overhead rough piping
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary pipin
In-racksprinklers
Secondary piping
Hose racks
Dispensers & shear valves
X
Final
Final
KITCHEN HOOD EXT GUISHING
MISC. INSPECTION
Detections stem
Spray booths
Function Test
Hood/duct extin uishin
Gas/Electrical sh off
High pile rack storage
Nozzle model) cement
H.P. vents/access/corridors
Fire alarm co ection
Tract access/hydrant verification
Final ir
I
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
BuildingKnox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time: L I Finish Time:
39
Steven Fox
Subject: FIRE21-0705 TR31822 O/H ROUGH/HYDRO LOT 25
Location: 29394 WESTWARD CIR
Start: Thu 5/13/2021 9:00 AM
End: Thu 5/13/2021 9:30 AM
Recurrence: (none)
Organizer: Menifee OFM
Call Handling Mode 2: 2
Rep. Name: HECTOR
Phone#: 951-847-2908
Cell#:
Co. Name: FSS
CrossSt: COMPASS
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Under round rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
I
Final for occupancy
Start
Time:
Finish Time:
Start Time:
Finish Time:
9