24930 WHISPERING WAY FIRE21-1538 COMPASSJohnathan Baker
Subject: FIRE21-1538 TR31822 SPK FINAL LOT 94
Location: 24930 WHISPERING WAY
Start:
End:
Recurrence:
Meeting Status:
Organizer:
Call Handling Mode 2:
Rep. Name: JUAN
Phone#: 951-358-9783
Fri 3/4/2022 8:30 AM
Fri 3/4/2022 9:00 AM
(none)
Meeting organizer
Johnathan Baker
2
Cell#:
Co. Name: FSS
CrossSt: COMPASS
HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS
FAIL
Thrust block pre -pour Rou h-wire inspection
Underground rough Function test
Underground hydro Duct detectors/velocity
Flush 24 hr. battery test
Final Sprinkler monitoring
SPRINKLER U.G. J Final
Thrust block re -pour SPECI SUPPRESSION
Underground rough Door fan tee
Underground hydro Abort tes
Flush Mecha cal shutdown
Final Dete or test
FIRE SPRINKLER \ \ Del e/ re -action
Weld inspection Final
Overhead rough piping UST/AST TANK
Overhead hydro Installation
UG flush / OK to connect Removal
Main drain/Inspect. Test Emergency shut off
Hi h pile storage Primary piping
In -rack sprinklers \ / Secondary piping
Hose racks Dispensers & shear valves
X Final Final
KITCHEN HOOD EXTINGUISHING MISC. INSPECTION
Detection system Spray booths
Function Test Hood/duct extinguishing
Gas/Electrical shut-off High pile rack storage
Nozzle model/placement H.P. vents/access/corridors
Fire alarm connection Tract access/hydrant verification
Final Other:
SPRAY BOOTHS KNOX SYSTEM
Installation Building Knox box
Air flow test Gate access Knox box/padlock
Mechanical interlock BUILDING INSPECTIONS
Extinguishing system T/I final
Fire alarm connection Shell final
7
Johnathan Baker
Subject: FIRE21-1538 TR31822 OH/ROUGH/HYDRO LOT 94
Location: 24930 WHISPERING WAY
Start:
End:
Recurrence:
Meeting Status:
Organizer:
Call Handling Mode 2:
Rep. Name: JUAN
Phone#: 951-358-9783
Thu 12/2/2021 10:30 AM
Thu 12/2/2021 11:00 AM
(none)
Meeting organizer
Johnathan Baker
2
Cell#:
Co. Name: FSS
LZOSSSt: L;UMF'A55
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Under round rough
Function test
Under round hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
X
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
9