Loading...
24800 CIMARRON CIR FIRE21-1178 COMPASSJohnathan Baker Subject: Location: Start: End: Recurrence: Meeting Status: Organizer: Call Handling Mode 2: Rep. Name: JUAN Phone#: 951-358-9783 FIRE21-1178 TR31822 SPK FINAL LOT 60 24800 CIMARRON CIRCLE Tue 12/21/2021 10:00 AM Tue 12/21/2021 10:30 AM (none) Meeting organizer Menifee OFM 2 Cell#: Co. Name: FSS kAUbbOL. %aulvir-MOO HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan/test Underground hydro \ Abort Ost Flush Wechanical shutdown Final D$fector test FIRE SPRINKLER ° Oeluge/pre-action Weld inspection Final Overhead rough piping / UST/AST TANK Overhead hydro / Installation UG flush / OK to connect 71 Removal Main drain/Inspect. Test V Emer enc shut off Hi h pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final X Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detections stem Spray booths Function Test / Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final 17 Jacie Mumme Subject: FIRE21-1178 TR31822 O/H ROUGH/HYDRO LOT 60 Location: 24800 CIMARRON CIRCLE Start: Wed 10/13/2021 11:30 AM End: Wed 10/13/2021 12:00 PM Recurrence: (none) Organizer: Sonya Rivera-Bu Call Handling Mode 2: Rep. Name: HECTOR Co. Name: FSS Phone#: 951-847-2908 Cell#: CrossSt: COMPASS HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. batter test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydra Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping x UST/AST TANK X Overhead hydro x Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Seconda piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: 50 Minutes Start Time: Finish Time: