24800 CIMARRON CIR FIRE21-1178 COMPASSJohnathan Baker
Subject:
Location:
Start:
End:
Recurrence:
Meeting Status:
Organizer:
Call Handling Mode 2:
Rep. Name: JUAN
Phone#: 951-358-9783
FIRE21-1178 TR31822 SPK FINAL LOT 60
24800 CIMARRON CIRCLE
Tue 12/21/2021 10:00 AM
Tue 12/21/2021 10:30 AM
(none)
Meeting organizer
Menifee OFM
2
Cell#:
Co. Name:
FSS
kAUbbOL. %aulvir-MOO
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan/test
Underground hydro
\
Abort Ost
Flush
Wechanical shutdown
Final
D$fector test
FIRE SPRINKLER
°
Oeluge/pre-action
Weld inspection
Final
Overhead rough piping
/
UST/AST TANK
Overhead hydro
/
Installation
UG flush / OK to connect
71
Removal
Main drain/Inspect. Test
V
Emer enc shut off
Hi h pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
X
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detections stem
Spray booths
Function Test
/
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
17
Jacie Mumme
Subject: FIRE21-1178 TR31822 O/H ROUGH/HYDRO LOT 60
Location: 24800 CIMARRON CIRCLE
Start: Wed 10/13/2021 11:30 AM
End: Wed 10/13/2021 12:00 PM
Recurrence: (none)
Organizer: Sonya Rivera-Bu
Call Handling Mode 2:
Rep. Name: HECTOR Co. Name: FSS
Phone#: 951-847-2908 Cell#: CrossSt: COMPASS
HYDRANT SYSTEM
PASS FAIL FIRE ALARM PASS FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. batter test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydra
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X Overhead rough piping
x UST/AST TANK
X Overhead hydro
x Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Seconda piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time: Finish Time:
50 Minutes
Start Time: Finish Time: