30269 OLD CORRAL CIR FIRE20-0782 KINGSTONIliana Gutierrez
Subject: FIRE20-0782 TR36485-4 SPK FINAL LOT 49
Location: 30269 OLD CORRAL CIR
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: DENA
Phone#: 909-906-5921
Thu 11/5/2020 9:30 AM
Thu 11/5/2020 10:00 AM
(none)
Menifee OFM
2
Cell#:
Co. Name: KPS
M 1101 *-ItR� :lq I ►1ci.7Lei
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechgaebil shutdown
Final
tortest
FIRE SPRINKLER
'Deluge/pre-action
Weld inspection
Final
Overhead rough piping
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
X
Final
Final
KITCHEN HOOD EIMNGUISHING
MISC. INSPECTION
Detections stem
Spray booths
Function Test
Hood/duct extinguishing
Gas/Elect ' 1 shut-off
High pile rack storage
Nozzl adel/placement
H.P. vents/access/corridors
F' alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time: Finish Time:
7
Steven Fox
Subject: FIRE20-0782 TR36485 O/H ROUGH/HYDRO LOT 49
Location: 30269 OLD CORRAL CIR
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: DENA
Phone#: 909-906-5921
Thu 8/27/2020 2:00 PM
Thu 8/27/2020 2:30 PM
(none)
Steven Fox
2
Cell#:
Co. Name: KPS
c;rossbt: KINGS I UN
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
;f
Installation
UG flush / OK to connect
/
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancv
Start Time: Finish Time:
49