30258 OLD CORRAL CIR FIRE20-0781 KINGSTONIliana Gutierrez
Subject: FIRE20-0781 TR36485-4 SPK FINAL LOT 48
Location: 30258 OLD CORRAL CIR
Start: Thu 11/5/2020 9:30 AM
End: Thu 11/5/2020 10:00 AM
Recurrence: (none)
Organizer: Menifee OFM
Call Handling Mode 2: 2
Rep. Name: DENA
Phone#: 909-906-5921
Cell#:
Co. Name: KPS
CrossSt: KINGSTON
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
Overhead rough piping
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to connect..00
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
X
Final
Final
KITCHEI'J'HOOD EXTINGUISHING
MISC. INSPECTION
DetectiQoi'ystem
Spray booths
Fungj& Test
Hood/duct extinguishing
G49/Electrical shut-off
High pile rack storage
,;Cozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time: Finish Time:
9
Steven Fox
Subject:
FIRE20-0781 TR36485-4 O/H ROUGH/HYDRO LOT 48
Location:
30258 OLD CORRAL CIR
Start:
Wed 8/26/2020 12:30 PM
End:
Wed 8/26/2020 1:00 PM
Recurrence: (none)
Organizer: Steven Fox
Call Handling Mode 2: 2
Rep. Name: DENA
Phone#: 909-906-5921
Cell#:
Co. Name: KPS
UFU55Ji: rl1114hJ 1 UN
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
'K
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time: Finish Time:
21