30031 STARGAZER WAY FIRE20-0704 SAVANNAHIliana Gutierrez
Subject: FIRE20-0704 TR36485 SPK FINAL LOT 27
Location: 30031 STARGAZER WAY
Start: Mon 10/26/2020 8:00 AM
End: Mon 10/26/2020 8:30 AM
Recurrence: (none)
Organizer: Menifee OFM
Call Handling Mode 2: 2
Rep. Name- HECTOR Co. Name: FSS
Phone#: 951-847-2908 Cell#: CrossSt: SAVANNAH
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARV
PASS
FAIL
Thrust block pre -pour
Rough -wire inspecti
Underground rough
Function test
Underground hydro
Duct detectorslvelocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Finaljr
Thrust block pre -pour
Z SPECIAL SUPPRESSION
Underground rough
or fan test
Underground hydro
Abort test
Flush
oOr
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
Overhead rough piping
dor IL
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
1bPrimary
piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final %`
Final
KITCHEN HOOD EXTINGUISHJNG
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off ZHigh
pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection .'
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time: Finish Time:
(liana Gutierrez
Subject: FIRE20-0704 TR36485-2 O/H ROUGH/HYDRO LOT 27
Location: 30031 AI
�AR(aN�� W
Start: Tue 8/18/2020 9:30 AM
End: Tue 8/18/2020 10:00 AM
Recurrence: (none)
Organizer: Menifee OFM
Call Handling Mode 2: 2
Rep. Name: HECTOR
Phone#: 951-847-2908
Cell#:
Co. Name
FSS
CrossSt: SAVANNAH
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start
Time: Finish Time:
5