29981 WESTERN FRONT DR FIRE20-0653 SADDLEWOODIliana Gutierrez
Subject: FIRE20-0653 TR36485-9 SPK FINAL LOT 21
Location: 29981 WESTERN FRONT DR
Start: Fri 9/11/2020 8:30 AM
End: Fri 9/11/2020 9:00 AM
Recurrence: (none)
Organizer: Menifee OFM
Call Handling Mode 2: 2
Rep. Name: HECTOR
Phone#: 951-847-2908
Cell#:
Co. Name: FSS
CrossSt: SADDLEWOOD
HYDRANT SYSTEM PASS FAIL
FIRE ALARM PASS FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection AF
Final
Overhead rough piping
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage 11FAML
Primary piping
In -rack sprinklers Z10JM7
Secondary piping
Hose racks AW AW
Dispensers & shear valves
Final
Final
KITCHEN H00WEXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Tesi..
Hood/duct extinguishing
GaslElectrjra8l shut-off
High pile rack storage
Nozzle del/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time: Finish Time:
7
Iliana Gutierrez
Subject:
FIRE20-0653 TR36485 O/H ROUGH/HYDRO LOT 21
Location:
29981 WESTERN FRONT DRIVE
Start:
Mon 7/20/2020 10:30 AM
End:
Mon 7/20/2020 11:00 AM
Recurrence:
(none)
Organizer:
Menifee OFM
Rep. Name: HECTOR
Co. Name: FSS
Phone#: 951-847-2908
Cell#:
CrossSt: SADDLEWOOD
HYDRANT SYSTEM
PASS FAIL
FIRE ALARM PASS FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X Overhead rough piping
UST/AST TANK
X Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish
Time:
Start Time:
Finish Time: