29969 WESTERN FRONT DR FIRE20-0652 SADDLEWOODIliana Gutierrez
Subject:
Location:
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: HECTOR
Phone#: 951-847-2908
FIRE20-0652 TR36485-9 SPK FINAL LOT 22
29969 WESTERN FRONT DR
Fri 9/11/2020 8:30 AM
Fri 9/11/2020 9:00 AM
(none)
Menifee OFM
2
Cell#:
Co. Name: FSS
CrossSt: SADDLEWOOD
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough-vyire inspection
Underground rough
Function test
Underground hydro
Duet detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
f+ry
Final
Overhead rough piping
UST/AST TANK
Overhead hydra
Installation
UG flush / OK to connect Ap.
Removal
Main drain/Inspect- Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racksAEM
Dispensers & shear valves
Final If qW
Final
KITCHEN HPOWr=XTINOUISHING
MISC. INSPECTION
Detection syste
Spray booths
Function Tes
Hood/duct extinguishing
GaslElectq shut-off
High pile rack storage
Nozzle no el/placement
H.P. vents/access/corridors
Fire al m connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start
Time: Finish Time:
9
(liana Gutierrez
Subject: FIRE20-06S2 TR36485 O/H ROUGH/HYDRO LOT 22
Location: 29969 WESTERN FRONT DRIVE
Start: Wed 7/22/2020 11:00 AM
End: Wed 7/22/2020 11:30 AM
Recurrence:
Organizer:
Rep. Name: HECTOR
Phone#: 951-847-2908
(none)
Menifee OFM
Cell#:
Co. Name: FSS
%.AU„JL. 0/1UULCVV000
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start
Time: Finish Time:
Start Time: Finish Time:
1