29962 WESTERN FRONT DR FIRE20-0648 SADDLEWOODIliana Gutierrez
Subject: FIRE20-0648 TR36485-9 SPK FINAL LOT 3
Location: 29962 WESTERN FRONT DR
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: HECTOR
Phone#: 951-847-2908
Fri 9/11/2020 8:00 AM
Fri 9/11/2020 8:30 AM
(none)
Menifee OFM
2
Cell#:
Co. Name: FSS
crossSt:
SADDLEWOOD
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection AtFinal
Overhead rough piping
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to connect _jf VIL
Removal
Main drain/inspect. Te
Emergency shut off
High pile stora a
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
X
Final
Final
KITCH N HOOD EXTINGUISHING
MISC. INSPECTION
Deteclosystern
Spray booths
Fu n Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start
Time: Finish Time:
1
Iliana Gutierrez
V%
Subject: RRE"20-0652 TR36485 O/H ROUGH/HYDRO LOT�2�
Location: 29969 WESTERN FRONT DRIVE
Start: Mon 7/20/2020 10:00 AM
End: Mon 7/20/2020 10:30 AM •Z6J0 _ Z 4444 � W OM
Recurrence: (none) W f6�&Vn 7FIVW C)V•
Organizer:
Menifee OFM
Rep. Name: HECTOR
Phone#: 951-847-2908 Cell#:
Co. Name: FSS
CrossSt: SADDLEWOOD
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X Overhead rough piping
UST/AST TANK
X Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
1 n� � tS
1/ ` J LLB
Start Time:
Finish Time:
1