Loading...
29909 WESTERN FRONT DR FIRE20-0814 SADDLEWOODIliana Gutierrez Subject: Location: Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: HECTOR Phone#: 951-847-2908 FIRE20-0814 TR36485-9 SPK FINAL LOT 26 29909 WESTERN FRONT DR Wed 10/21/2020 9:00 AM Wed 10/21/2020 9:30 AM (none) Menifee OFM 2 Cell#: Co. Name: FSS CrossSt: SADDLEWOOD HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function teaf Underground hydro Duct det�fors/velocity Flush 24 hr. kAttery test Final SprioKler monitoring SPRINKLER U.G. F L41 Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro / Abort test Flush Mechanical shutdown Final Z Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final Overhead rough piping Aw I UST/AST TANK Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final J76 Final KITCHEN HOOD EXTINGUISHING' MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle modellplacernenl H.P. vents/access/corridors Fire alarm connection ' Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: 13 (liana Gutierrez Subject: Location: Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: HECTOR Phone#: 951-847-2908 FIRE20-0814 TR36485-9 O/H ROUGH/HYDRO LOT 26 29909 WESTERN FRONT DRIVE Mon 8/31/2020 2:00 PM Mon 8/31/2020 2:30 PM (none) Menifee OFM 2 Cell#: Co. Name: FSS CrossSt: SADDLEWOOD HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro A Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: 35