29855 SADDLE RANCH PL FIRE20-1057 VAQUEROIliana Gutierrez VIVirvnti PoUtiR 61130Z-0
Subject: FIRE20-1057 TR36485-8 SPK FINAL LOT 6
Location: 298SS SADDLE RANCH PLACE
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name. JOE
Phone#: 951-595-5423
Mon 12/14/2020 8:00 AM
Mon 12/14/2020 8:30 AM
(none)
Menifee OFM
Cell#:
Co. Name
NP MECHANICAL
CrossSt: VAQUERO
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 lir. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
J
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
Overhead rough piping
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
►
Primary piping
In -rack sprinklers or
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical 5LUt-off
High pile rack storage
Nozzle mode_ placement
H.P. vents/access/corridors
Fire afarm,C'onnection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time: Finish Time:
Iliana Gutierrez
Subject: FIRE20-1057 TR36485 O/H ROUGH/HYDRO LOT 6
Location: 29855 SADDLE RANCH PLACE
Start: Wed 9/30/2020 12:30 PM
End: Wed 9/30/2020 1:00 PM
Recurrence: (none)
Organizer: Menifee OFM
Call Handling Mode 2: 2
Rep. Name: JUAN
Phone#: ZOOM 951-858-7939
Cell#:
HYDRANT SYSTEM PASS FAIL
Thrust block pre -pour
Underground rough
Underground hydro
Flush
Final
SPRINKLER U.G.
Thrust block pre -pour
Underground rough
Underground hydro
Flush
Final
FIRE SPRINKLER
Weld inspection
X Overhead rough piping
X Overhead hydro
UG flush / OK to connect
Main drain/Inspect. Test
High pile storage
In -rack sprinklers
Hose racks
Final
KITCHEN HOOD EXTINGUISHING
Detection system
Function Test
Gas/Electrical shut-off
Nozzle model/placement
Fire alarm connection
Final
SPRAY BOOTHS
Installation
Air flow test
Mechanical interlock
Extinguishing system
Fire alarm connection
Final
Start Time: Finish Time:
Co. Name: NP MECHANICAL
CrossSt: VAQUERO
FIRE ALARM PASS FAIL
Rough -wire inspection
Function test
Duct detectors/velocity
24 hr. battery test
Sprinkler monitoring
Final
SPECIAL SUPPRESSION
Door fan test
Abort test
Mechanical shutdown
Detector test
Deluge/pre-action
Final
UST/AST TANK
Installation
Removal
Emergency shut off
Primary piping
Secondary piping
Dispensers & shear valves
Final
MISC. INSPECTION
Spray booths
Hood/duct extinguishing
High pile rack storage
H.P. vents/access/corridors
Tract access/hydrant verification
Other:
KNOX SYSTEM
Building Knox box
Gate access Knox box/padlock
BUILDING INSPECTIONS
T/I final
Shell final
Final for occupancy
19