29848 SADDLE RANCH PL FIRE20-1056 VAQUEROVI Y�-val P-GUGt� g1301-Zo
Iliana Gutierrez
Subject:
Location:
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: JOE
Phone#: 951-595-5423
FIRE20-1056 TR36485-8 SPK FINAL LOT 77
29848 SADDLE RANCH PLACE
Mon 12/14/2020 8:30 AM
Mon 12/14/2020 9:00 AM
(none)
Menifee OFM
2
Cell#:
Co. Name: NP MECHANICAL
%-olU,JOI. V/AWL)rZr[U
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wife inspection
Underground rough
Functivri test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
F'Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
Overhead rough piping
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to connect
4111rW
Removal
Main drainlinspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test ZHood/duct
extinguishing
Gas/Electrical s -off
High pile rack storage
Nozzle model/plbcerne?nt
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start
Time: Finish Time:
7
Iliana Gutierrez
Subject: FIRE20-1056 TR36485 O/H ROUGH/HYDRO LOT 77
Location: 29848 SADDLE RANCH PLACE
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Wed 9/30/2020 1:30 PM
Wed 9/30/2020 2:00 PM
(none)
Menifee OFM
2
Rep. Name: JUAN
Phone#: ZOOM 951-858-7939
Cell#:
Co. Name: NP MECHANICAL
CrossSt: VAQUERO
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time: Finish Time:
25