Loading...
29831 SADDLE RANCH PL FIRE20-0740 VAQUEROIliana Gutierrez Subject: FIRE20-0740 TR36485-8 SPK FINAL LOT 8 Location: 29831 SADDLE RANCH PL Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: JOE Phone#: 951-595-5423 Wed 11/25/2020 9:30 AM Wed 11/25/2020 10:00 AM (none) Menifee OFM 2 Cell#: Co. Name: NP MECHANICAL U[U,SOL. VNhtIJCRV HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final Overhead rough piping UST/AST TANK Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks > Dispensers & shear valves X Final - Final KITCHEN HOOD EXTINGU ING MISC. INSPECTION Detection system Spray booths Function Test ; Hood/duct extinguishing Gas/Electric t"shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire_318�m connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: 9 Steven Fox Subject: Location: Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: DANIEL Phone#: 951-703-5210 FIRE20-0740 TR36485-8 O/H ROUGH/HYDRO LOT 8 29831 SADDLE RANCH PLACE Thu 8/20/2020 2:00 PM Thu 8/20/2020 2:30 PM (none) Steven Fox 2 Cell#: Co. Name: NP MECHANICAL %.AUJ,JI. V/1h(ummu HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping V UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: 9