Loading...
29812 SADDLE RANCH PL FIRE20-0735 VAQUEROIliana Gutierrez Subject: Location: Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: JOE Phone#: 951-595-5423 FIRE20-0735 TR36485-8 SPK FINAL LOT 74 29812 SADDLE RANCH PLACE Tue 11/10/2020 9:00 AM Tue 1111012020 9:30 AM (none) Menifee OFM 2 Cell#: Co. Name NP MECHANICAL lit V.000L. VP%WV Cr\\! HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors,[velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Firlof Thrust block pre -pour Z SPECIAL SUPPRESSION Underground rough 40F Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final Overhead rough piping UST/AST TANK Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers - Secondary piping Hose racks Dispensers & shear valves X Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle mode!/;cement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: (liana Gutierrez Subject: FIRE20-0735 TR36485-8 O/H ROUGH/HYDRO LOT 74 Location: 29812 SADDLE RANCH PLACE Start: Wed 8/12/2020 11:00 AM End: Wed 8/12/2020 11:30 AM Recurrence: (none) Organizer: Menifee OFM Call Handling Mode 2: 2 Rep. Name: DANIEL Phone#: 951-703-5210 Cell#: Co. Name: NP MECHANICAL CrossSt: VAQUERO HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping 'y, UST/AST TANK X Overhead hydro )-1 Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: