29812 SADDLE RANCH PL FIRE20-0735 VAQUEROIliana Gutierrez
Subject:
Location:
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: JOE
Phone#: 951-595-5423
FIRE20-0735 TR36485-8 SPK FINAL LOT 74
29812 SADDLE RANCH PLACE
Tue 11/10/2020 9:00 AM
Tue 1111012020 9:30 AM
(none)
Menifee OFM
2
Cell#:
Co. Name
NP MECHANICAL
lit V.000L. VP%WV Cr\\!
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors,[velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Firlof
Thrust block pre -pour
Z SPECIAL SUPPRESSION
Underground rough
40F
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
Overhead rough piping
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
-
Secondary piping
Hose racks
Dispensers & shear valves
X
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle mode!/;cement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time: Finish Time:
(liana Gutierrez
Subject: FIRE20-0735 TR36485-8 O/H ROUGH/HYDRO LOT 74
Location: 29812 SADDLE RANCH PLACE
Start: Wed 8/12/2020 11:00 AM
End: Wed 8/12/2020 11:30 AM
Recurrence: (none)
Organizer: Menifee OFM
Call Handling Mode 2: 2
Rep. Name: DANIEL
Phone#: 951-703-5210
Cell#:
Co. Name: NP MECHANICAL
CrossSt: VAQUERO
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
'y,
UST/AST TANK
X
Overhead hydro
)-1
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start
Time: Finish Time: