28456 ABBEY LN FIRE21-1524 PERSANOIliana Gutierrez
Subject: FIRE21-1524 TR29835 SPK FINAL LOT 2
Location: 28456 ABBEY LN
Start: Wed 2/16/2022 10:00 AM
End: Wed 2/16/2022 10:30 AM
Recurrence:
Meeting Status:
Organizer:
Call Handling Mode 2:
Rep. Name: RACHEL
Phone#: 909-906-5921
(none)
Meeting organizer
Menifee OFM
N
Cell#:
Co. Name: KPS
CrossSt: PERSANO
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. ba tte test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
-Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
/
Deluge/pre-action
Weld inspection
/
F' a
Overhead rough piping
/
ST/AST TANK
Overhead hydro
JrWMion
UG flush / OK to connect
oval
Main drain/Inspect. Test
►
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
X
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection stem
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
7
(liana Gutierrez
Subject: FIRE21-1524 TR29835 O/H ROUGH/HYDRO LOT 2
Location: 28456 ABBEY LN
Start: Tue 12/14/2021 8:00 AM
End: Tue 12/14/2021 8:30 AM
Recurrence: (none)
Meeting Status: Meeting organizer
Organizer: Menifee OFM
Call Handling Mode 2: 2
Rep. Name: RACHEL
Phone#: 909-906-5921
Cell#:
Co. Name: KPS
UFU5501. I-CMOAINU
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
I Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final