Loading...
28456 ABBEY LN FIRE21-1524 PERSANOIliana Gutierrez Subject: FIRE21-1524 TR29835 SPK FINAL LOT 2 Location: 28456 ABBEY LN Start: Wed 2/16/2022 10:00 AM End: Wed 2/16/2022 10:30 AM Recurrence: Meeting Status: Organizer: Call Handling Mode 2: Rep. Name: RACHEL Phone#: 909-906-5921 (none) Meeting organizer Menifee OFM N Cell#: Co. Name: KPS CrossSt: PERSANO HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. ba tte test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro -Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER / Deluge/pre-action Weld inspection / F' a Overhead rough piping / ST/AST TANK Overhead hydro JrWMion UG flush / OK to connect oval Main drain/Inspect. Test ► Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves X Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection stem Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final 7 (liana Gutierrez Subject: FIRE21-1524 TR29835 O/H ROUGH/HYDRO LOT 2 Location: 28456 ABBEY LN Start: Tue 12/14/2021 8:00 AM End: Tue 12/14/2021 8:30 AM Recurrence: (none) Meeting Status: Meeting organizer Organizer: Menifee OFM Call Handling Mode 2: 2 Rep. Name: RACHEL Phone#: 909-906-5921 Cell#: Co. Name: KPS UFU5501. I-CMOAINU HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final I Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final