28385 ABBEY LN FIRE21-1518 PERSANOIliana Gutierrez
Subject:
Location:
Start:
End:
Recurrence:
Meeting Status:
Organizer:
Call Handling Mode 2:
Rep. Name: RACHEL
Phone#: 909-906-5921
FIRE21-1518 TR29835 SPK FINAL LOT 71
28385 ABBEY LN
Wed 2/16/2022 11:30 AM
Wed 2/16/2022 12:00 PM
(none)
Meeting organizer
Menifee OFM
2
Co. Name:
Cell#:
KPS
UrOSSSt: F'LKtiANU
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre- our
Rou h-wire ins ebtion
Underground rough
Function test/
Underground hydro
Duct deteptors/velocit
Flush
24 hr. Oftery test
Final
S rinkler monitoring
SPRINKLER U.G.
I FAal
Thrust block pre -pour
' SPECIAL SUPPRESSION
Underground rough
Door fan test
Under round hydro
Abort test
Flush
Mechanical shutdown
Final
,
Detector test
FIRE SPRINKLER
/
Del a/prD-action
Weld inspection
l=inal
Overhead rough piping
UST/AST TANK
Overhead hydro
:. �=
Ilation
UG flush / OK to connect
Removal
Main drain/Inspect. Test /
Emer e cy shut off
High pile storage /
Primary piping
In-racksprinklers /
Secondary piping
Hose racks /
Dispensers & shear valves
X
Final /
Final
KITCHEN HOOD EXTINGUISHING
'
MISC. INSPECTION
Detections stem /
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shutoff
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
27
Johnathan Baker
Subject:
FIRE21-1518 TR29835 O/H ROUGH/HYDRO LOT 71
Location:
28385 ABBEY LN
Start:
Tue 11/30/2021 1:00 PM
End:
Tue 11/30/2021 1:30 PM
Recurrence:
(none)
Organizer:
Johnathan Baker
Call Handling Mode 2:
2
Rep. Name: RACHEL
Phone#: 909-906-5921
Cell#:
Co. Name: KPS
CrossSt: PERSANO
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start
Time:
Finish Time:
Start Time:
I Finish Time:
21