28144 ZIPPER WAY FIRE21-1359 INDIGOIliana Gutierrez
Subject: FIRE21-1359 TR29835 SPK FINAL LOT 38
Location: 28144 ZIPPER WAY
Start:
End:
Recurrence:
Meeting Status:
Organizer:
Call Handling Mode 2:
Rep. Name: RACHEL
Phone#: 909-906-5921
Tue 2/1/2022 2:30 PM
Tue 2/1/2022 3:00 PM
(none)
Meeting organizer
Menifee OFM
2
Cell#:
Co. Name: KPS
CrossSt: INDIGO
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough-wireinspection
Underground rou h
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
/
SPECIAL SUPPRESSION
Underground rough
,
'
Door fan test
Underground hydro
/
Abort test
Flush
/
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
Overhead rough piping
UST/AST TANK
Overhead hydro Z
Installation
UG flush / OK to conned
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary pipin
Hose racks
Dispensers & shear valves
X
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
5
Johnathan Baker
Subject: FIRE21-1359 TR29835 O/H ROUGH/HYDRO LOT 38
Location: 28144 ZIPPER WAY
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: RACHEL
Phone#: 909-906-5921
Thu 11/4/2021 8:00 AM
Thu 11/4/2021 8:30 AM
(none)
Menifee OFM
2
Cell#:
Co. Name:
KPS
l.rU550L. IIV L )I%7V
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
I Finish Time:
3