Loading...
27386 CALABRIA CT FIRE21-1014 SALERNOIliana Gutierrez Subject: FIRE21-1014 TR29835 SPK FINAL LOT 45 Location: 27386 CALABRIA CT Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: CARLOS Phone#: 951-603-6341 Tue 9/28/2021 8:00 AM Tue 9/28/2021 8:30 AM (none) Menifee OFM 2 Cell#: Co. Name NP MECHANICAL lAL)bbOL. 0MLCMINU HYDRANT SYSTEM PASS FAIL FI ALARM PASS FAIL Thrust block pre -pour I Rou h-wir •inspection Under round rough I Functio est Under round hydro I Duct 06tectors/velocit Flush I 24Xr. battery test Final Aprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour / SPECIAL SUPPRESSION Underground rough Z Door fan test Underground hydro Abort test Flush Pechanical shutdown Final Detector test FIRE SPRINKLER Delu e/ re -action Weld inspection Final Overhead rou h piping / UST/AST TANK Overhead hydro Installation UG flush / OK to connect ► Removal Main drain/inspect. Test Emergeng shut off High pile storage Primary piping In-racksprinklers Secondary piping Hose racks Dispensers & shear valves X Final f Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detections stem Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut ff High pile rack storage Nozzle model) I Cement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final / Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupanc Start Time: Finish Time: Start Time: Finish Time: 3 Steven Fox Subject: FIRE21-1014 TR29835 O/H ROUGH/HYDRO LOT 45 Location: 27386 CALABRIA CT Start: Tue 7/27/2021 4:30 PM End: Tue 7/27/2021 5:00 PM Recurrence: (none) Organizer: Steven Fox Call Handling Mode 2: 2 Rep. Name: CARLOS Phone#: 951-603-6341 Cell#: Co. Name: NP MECHANICAL UfUSSJI: JHLCKIVV HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Under round hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 17