27386 CALABRIA CT FIRE21-1014 SALERNOIliana Gutierrez
Subject: FIRE21-1014 TR29835 SPK FINAL LOT 45
Location: 27386 CALABRIA CT
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: CARLOS
Phone#: 951-603-6341
Tue 9/28/2021 8:00 AM
Tue 9/28/2021 8:30 AM
(none)
Menifee OFM
2
Cell#:
Co. Name
NP MECHANICAL
lAL)bbOL. 0MLCMINU
HYDRANT SYSTEM
PASS
FAIL
FI ALARM
PASS
FAIL
Thrust block pre -pour
I Rou h-wir •inspection
Under round rough
I Functio est
Under round hydro
I Duct 06tectors/velocit
Flush
I 24Xr. battery test
Final
Aprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
/
SPECIAL SUPPRESSION
Underground rough
Z
Door fan test
Underground hydro
Abort test
Flush
Pechanical shutdown
Final
Detector test
FIRE SPRINKLER
Delu e/ re -action
Weld inspection
Final
Overhead rou h piping
/
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to connect
â–º
Removal
Main drain/inspect. Test
Emergeng shut off
High pile storage
Primary piping
In-racksprinklers
Secondary piping
Hose racks
Dispensers & shear valves
X
Final f
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detections stem
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut ff
High pile rack storage
Nozzle model) I Cement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final /
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupanc
Start
Time:
Finish Time:
Start Time:
Finish Time:
3
Steven Fox
Subject: FIRE21-1014 TR29835 O/H ROUGH/HYDRO LOT 45
Location: 27386 CALABRIA CT
Start: Tue 7/27/2021 4:30 PM
End: Tue 7/27/2021 5:00 PM
Recurrence: (none)
Organizer: Steven Fox
Call Handling Mode 2: 2
Rep. Name: CARLOS
Phone#: 951-603-6341
Cell#:
Co. Name: NP MECHANICAL
UfUSSJI: JHLCKIVV
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Under round hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start
Time:
Finish Time:
Start Time:
Finish Time:
17