Loading...
27369 CALABRIA CT FIRE21-1530 SALERNODavid Young Subject: FIRE21-1530 TR29835 SPK FINAL LOT 40 Location: 27369 CALABRIA CT Start: End: Recurrence: Meeting Status: Organizer: Call Handling Mode 2: Rep. Name: CARLOS Phone#: 951-603-6341 Mon 2/14/2022 1:00 PM Mon 2/14/2022 1:30 PM (none) Meeting organizer David Young 2 Cell#: Co. Name: NP MECHANICAL CrossSt: SALERNO HYDRANT SYSTEM PASS FAIL FIRE ALARM / PASS FAIL Thrust block pre -pour Rough -wire inspection / Under round rough Function test / Under round hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitori SPRINKLER U.G. Final 1-1 Thrust block pre -pour SPfe1A1L SUPPRESSION Underground rough Door fart test Underground hydro AboK test Flush L.Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final Overhead rough piping UST/AST TANK Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks X Dispensers & shear valves X Final X Final KITCHEN HOOD EXTINjidISHING MISC. INSPECTION Detection system / Spray booths Function Test Hood/duct extinguishing Gas/Electrical sh off High pile rack storage Nozzle model/cement H.P. vents/access/corridors Fire alarm c nection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Ins lation Building Knox box r flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final 1 Johnathan Baker Subject: FIRE21-1530 TR29835 O/H ROUGH/HYDRO LOT 40 Location: 27369 CALABRIA CT Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: CARLOS Phone#: 951-603-6341 Thu 12/9/2021 11:30 AM Thu 12/9/2021 12:00 PM (none) Menifee OFM 2 Cell#: Co. Name: NP MECHANICAL CrossSt: SALERNO HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour I Rou h-wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block re -pour SPECIAL SUPPRESSION Underground rough Door fan test Under round hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary ipin In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detections stem Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 11