Loading...
26635 STIX DR FIRE21-1513 PERSANO'k Iliana Gutierrez Subject: FIRE21-1513 TR29835 SPK FINAL LOT 59 Location: 26635 STIX DR Start: End: Recurrence: Meeting Status: Organizer: Call Handling Mode 2: Rep. Name: RACHEL Phone#: 909-906-5921 Wed 2/16/2022 12:30 PM Wed 2/16/2022 1:00 PM (none) Meeting organizer Menifee OFM 2 Co. Name Cell#: KPS Grossbt: PER5ANO HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct deteptors/velocit Flush 24 hr. PAtery test Final SprirAer monitoring SPRINKLER U.G. Firpal Thrust block pre -pour SPECIAL SUPPRESSION Underground rough /I Door fan test Underground hydro Abort test Flush Mechanical shutdown Final ectgr test FIRE SPRINKLER / e pre -action Weld inspection Overhead rough piping s' UST/AST TANK Overhead hydro / nstallation UG flush / OK to connect 4EA740 Removal Main drain/Inspect. Test / Emergency shut off High pile storage Primary piping In-racksprinklers Secondary piping Hose racks / Dispensers & shear valves X Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detections stem Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off / High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final / Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test/ Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final 37 Johnathan Baker Subject: Location: Start: End: Recurrence: Meeting Status: Organizer: Call Handling Mode 2: Rep. Name: RACHEL Phone#: 909-906-5921 FIRE21-1513 TR29835 SPK FINAL LOT 59 26635 STIX DR Fri 2/4/2022 2:00 PM Fri 2/4/2022 2:30 PM (none) Meeting organizer Johnathan Baker N Cell#: Co. Name: KPS kAU550L: I- C MO/A1V U HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Under round hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final Overhead rough piping UST/AST TANK Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves X Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Johnathan Baker Subject: Location: Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: RACHEL Phone#: 909-906-5921 FIRE21-1513 TR29835 O/H ROUGH/HYDRO LOT 59 26635 STIX DR Wed 11/17/2021 2:00 PM Wed 11/17/2021 2:30 PM (none) Johnathan Baker 2 Cell#: Co. Name: %.lUbbOL. rr=r-%Oruw HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final i Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping_UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 31