Loading...
26551 STIX DR FIRE21-1510 PERSANOJohnathan Baker Subject: FIRE21-1510 TR29835 SPK FINAL LOT 66 Location: 26551 STIX DR Start: End: Recurrence: Meeting Status: Organizer: Call Handling Mode 2: Rep. Name: RACHEL Phone#: 909-906-5921 Fri 1/28/2022 8:00 AM Fri 1/28/2022 8:30 AM (none) Meeting organizer Johnathan Baker 2 Cell#: Co. Name: KPS CrossSt: PERSANO HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour I Rou h-wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 1 :?4 hl. battery test Final I /Spfinkler monitoring SPRINKLER U.G. ' F al Thrust block pre -pour N, i SPECIAL SUPPRESSION Underground rough ' Door fan test Underground hydro / Abort test Flush ' Mechanical shutdown Final Detector test FIRE SPRINKLER Delu e/ re -action Weld inspection Final Overhead rough piping UST/AST TANK Overhead hydro / " Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emegency shut off High pile storage Primary piping In -rack sprinklers Secondary pipin2 Hose racks Dispense & shear valves X Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final 5 Johnathan Baker Subject: Location: Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: RACHEL Phone#: 909-906-5921 FIRE21-1510 TR29835 O/H ROUGH/HYDRO LOT 66 26551 STIX DR Wed 11/10/2021 1:00 PM Wed 11/10/2021 1:30 PM (none) Menifee OFM 2 Cell#: Co. Name: KPS VI VJJJI. rLIIJ/'%IVV HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rou h-wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battwy test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final Overhead rough piping UST/AST TANK Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extingui hing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: ` Start Time: Finish Time: 3