FIRE21-1511 TR29835 SPK FINAL LOT 67
26539 STIX DR
Fri 1/28/2022 8:00 AM
Fri 1/28/2022 8:30 AM
(none)
Meeting organizer
Johnathan Baker
2
Cell#:
Co. Name:
KPS
c;ross5t: F'tMSANU
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Under round rough
Function test
Under round hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
/ SPECIAL SUPPRESSION
Underground rough
boor fan test
Underground hydro
\
`
Abort test
Flush
\ `\
We7chanical shutdown
Final
\ \
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
�,
Final
Overhead rough piping
\
UST/AST TANK
Overhead hydro
/ /
/
Installation
UG flush / OK to connect
V/
Removal
Main drain/Inspect. Test
X
'
Emergency shut off
High pile storage
/
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
/
Spray booths
Function Test
,/
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hvdrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
3
Johnathan Baker
Subject:
Location:
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2
Rep. Name: RACHEL
Phone#: 909-906-5921
FIRE21-1511 TR29835 O/H ROUGH/HYDRO LOT 67
26539 STIX DR
Wed 11/10/2021 1:00 PM
Wed 11/10/2021 1:30 PM
(none)
Menifee OFM
2
Cell#:
Co. Name: KPS
CrossSt: PERSANO
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battea test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In-racksprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detections stem
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy