Loading...
31667 DILL CT FIRE21-0066 PEPPERTREEIliana Gutierrez Subject: Location: Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: RACHEL Phone#: 909-906-5921 FIRE21-0066 TR30142 SPK FINAL LOT 52 31667 DILL CT Tue 8/24/2021 8:00 AM Tue 8/24/2021 8:30 AM (none) Menifee OFM Cell#: Co. Name: KP Cra t: PEPPERTREE HYDRANT SYSTEM PASS FAIL F ALARM PASS FAIL Thrust block pre -pour Rou h-w' ins ection Underground rou h Functi test Underground hydro Du etectors/velocit Flush r. battery test Final OSprinkler monitoring SPRINKLER U.G. Final Thrust block re -pour SPECIAL SUPPRESSION Underground rough / Door fan test Underground h dro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER e/ re -action Weld inspection nal Overhead rough piping UST/AST TANK Overhead hydro Installation UG flush / OK to connect A iF P Removal Main drain/Inspect. Test Emer enc shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves X Final Final KITCHEN HOOD EXTIN991SWING. MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle modeliplac2Lnt H.P. vents/access/corridors Fire alarm connegfon Tract access/hydrant verification Final ZOther: SYRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: Iliana Gutierrez Subject: FIRE21-0066 TR30142 O/H ROUGH/HYDRO LOT 52 Location: 31667 DILL CT Start: Wed 6/30/2021 2:00 PM End: Wed 6/30/2021 2:30 PM Recurrence: (none) Organizer: Steven Fox Call Handling Mode 2: 2 Rep. Name: RACHEL Phone#: 909-906-5921 Cell#: Co. Name: KPS CrossSt: PEPPERTREE HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. batte test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 7