31667 DILL CT FIRE21-0066 PEPPERTREEIliana Gutierrez
Subject:
Location:
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: RACHEL
Phone#: 909-906-5921
FIRE21-0066 TR30142 SPK FINAL LOT 52
31667 DILL CT
Tue 8/24/2021 8:00 AM
Tue 8/24/2021 8:30 AM
(none)
Menifee OFM
Cell#:
Co. Name:
KP
Cra t: PEPPERTREE
HYDRANT SYSTEM
PASS
FAIL
F ALARM
PASS
FAIL
Thrust block pre -pour
Rou h-w' ins ection
Underground rou h
Functi test
Underground hydro
Du etectors/velocit
Flush
r. battery test
Final
OSprinkler monitoring
SPRINKLER U.G.
Final
Thrust block re -pour
SPECIAL SUPPRESSION
Underground rough
/
Door fan test
Underground h dro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
e/ re -action
Weld inspection
nal
Overhead rough piping
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to connect A
iF
P
Removal
Main drain/Inspect. Test
Emer enc shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
X
Final
Final
KITCHEN HOOD EXTIN991SWING.
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle modeliplac2Lnt
H.P. vents/access/corridors
Fire alarm connegfon
Tract access/hydrant verification
Final ZOther:
SYRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start
Time:
Finish Time:
Start Time:
Finish Time:
Iliana Gutierrez
Subject:
FIRE21-0066 TR30142 O/H ROUGH/HYDRO LOT 52
Location:
31667 DILL CT
Start:
Wed 6/30/2021 2:00 PM
End:
Wed 6/30/2021 2:30 PM
Recurrence:
(none)
Organizer:
Steven Fox
Call Handling Mode 2:
2
Rep. Name: RACHEL
Phone#: 909-906-5921
Cell#:
Co. Name: KPS
CrossSt: PEPPERTREE
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. batte test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start
Time:
Finish Time:
Start Time:
Finish Time:
7