Loading...
31664 BUCKEYE WY FIRE21-0437 CYPRESS NORTH(liana Gutierrez Subject: Location: Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: RACHEL Phone#: 909-906-5921 FIRE21-0437 TR30142 SPK FINAL LOT 99 31664 BUCKEYE WY Tue 8/24/2021 10:00 AM Tue 8/24/2021 10:30 AM (none) Menifee OFM 2 Cell#: Co. Name: KPS CrossSt: CYPRESS NORTH HYDRANT SYSTEM PASS FAIL FIRE 6LARM PASS FAIL Thrust block pre -pour Rough -wire in ection Underground rough Function to Under round hydro Duct dete6iors/velocit Flush 24 hr, battery test Final Sprinkler monitoring SPRINKLER U.G. Ffnal Thrust block pre -pour SPECIAL SUPPRESSION Under round rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER i 1LDeluge/pre-action Weld inspection Overhead rough piping 100F UST/AST TANK Overhead hydro XV Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Seconda piping Hose racks Dispensers & shear valves A Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical sh off High pile rack storage Nozzle model/pplAcement H.P. vents/access/corridors Fire alarm cqKsection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air ow test Gate access Knox box/padlock echanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 21 (liana Gutierrez Subject: FIRE21-0437 TR30142 O/H ROUGH/HYDRO LOT 99 Location: 31664 BUCKEYE WAY Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: RACHEL Phone#: 909-906-5921 Wed 6/30/2021 3:00 PM Wed 6/30/2021 3:30 PM (none) Menifee OFM 2 Cell#: Co. Name: KPS L:rossbl: t;YF'KtJJ HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In-racksprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time? Start Time: Finish Time: G