31664 BUCKEYE WY FIRE21-0437 CYPRESS NORTH(liana Gutierrez
Subject:
Location:
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: RACHEL
Phone#: 909-906-5921
FIRE21-0437 TR30142 SPK FINAL LOT 99
31664 BUCKEYE WY
Tue 8/24/2021 10:00 AM
Tue 8/24/2021 10:30 AM
(none)
Menifee OFM
2
Cell#:
Co. Name: KPS
CrossSt: CYPRESS NORTH
HYDRANT SYSTEM
PASS
FAIL
FIRE 6LARM
PASS
FAIL
Thrust block pre -pour
Rough -wire in ection
Underground rough
Function to
Under round hydro
Duct dete6iors/velocit
Flush
24 hr, battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Ffnal
Thrust block pre -pour
SPECIAL SUPPRESSION
Under round rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
i
1LDeluge/pre-action
Weld inspection
Overhead rough piping
100F
UST/AST TANK
Overhead hydro
XV
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Seconda piping
Hose racks
Dispensers & shear valves
A
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical sh off
High pile rack storage
Nozzle model/pplAcement
H.P. vents/access/corridors
Fire alarm cqKsection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air ow test
Gate access Knox box/padlock
echanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time:
21
(liana Gutierrez
Subject: FIRE21-0437 TR30142 O/H ROUGH/HYDRO LOT 99
Location: 31664 BUCKEYE WAY
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: RACHEL
Phone#: 909-906-5921
Wed 6/30/2021 3:00 PM
Wed 6/30/2021 3:30 PM
(none)
Menifee OFM
2
Cell#:
Co. Name: KPS
L:rossbl: t;YF'KtJJ
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In-racksprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time?
Start Time:
Finish Time:
G