Loading...
31642 BUCKEYE WAY FIRE21-0440 CYPRESS NORTH(liana Gutierrez Subject: FIRE21-0440 TR30142 SPK FINAL LOT 97 Location: 31642 BUCKEYE WY Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: RACHEL Phone#: 909-906-5921 Tue 8/24/2021 10:00 AM Tue 8/24/2021 10:30 AM (none) Menifee OFM Cell#: Co. Name: KPS CrossSt: CYPRESS NORTH HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough-vAe inspection Underground rough Func[A test Underground hydro Du detectors/velocit Flush Vhr. battery test Final OSprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final for test FIRE SPRINKLER lu e/ re -action Weld inspection Final Overhead rough piping UST/AST TANK Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In-racksprinklers Secondary piping Hose racks Dispensers & shear valves X Final Final KITCHEN HOOD EXTINdUISHING MISC. INSPECTION Detections stem Spray booths Function Test Hood/duct extinguishing Gas/Electrical shutl6ff High pile rack storage Nozzle modell I ement H.P. vents/access/corridors Fire alarm co ection Tract access/hydrant verification Final ZOther: ,OOSPRAY BOOTHS KNOX SYSTEM InstaII56n Buildina Knox box Air fl test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extin ui hing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 19 Iliana Gutierrez Subject: Location: Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: RACHEL Phone#: 909-906-5921 FIRE21-0440 TR30142 O/H ROUGH/HYDRO LOT 97 31642 BUCKEYE WAY Wed 6/30/2021 2:30 PM Wed 6/30/2021 3:00 PM (none) Menifee OFM 2 Cell#: Co. Name KPS lol UJJJI. lo T rMMOO HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extingui hing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 3