31638 DILL CT FIRE21-0065 PEPPERTREEIliana Gutierrez
Subject:
Location:
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: RACHEL
Phone#: 909-906-5921
FIRE21-0065 TR30142 SPK FINAL LOT 50
31638 DILL CT
Tue 8/24/2021 8:00 AM
Tue 8/24/2021 8:30 AM
(none)
Menifee OFM
2
Co. Name: KPS
Cell#: 09!� CrossSt: PEPPERTREE
If
HYDRANT SYSTEM
PASS
FAIL
Yr FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Under round hydro
Duct detectors/velocity
Flush
y
24 hr. battery test
Final
FFSprinkler
monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
Al.SPECIAL
SUPPRESSION
Underground rough
JF
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld insp ection
Final
Overhead rough piping
►
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In-racksprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
SpraX booths
Function Test%`
Hood/duct extinguishing
Gas/Electri I shut-off
High pile rack storage
Nozzle q dei/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Fine
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start
Time, Finish Time:
Start Time: Finish Time:
-S./
Iliana Gutierrez
Subject:
Location:
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: RACHEL
Phone#: 909-906-5921
FIRE21-0065 TR30142 O/H ROUGH/HYDRO LOT 50
31638 DILL CT
Wed 6/30/2021 1:30 PM
Wed 6/30/2021 2:00 PM
(none)
Steven Fox
2
Cell#:
Co. Name: KPS
%.ivaaOL. rr_rrr_rN 1 r[1=1=
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Buildin Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time:
1