Loading...
31619 DILL CT FIRE21-0112 PEPPERTREESteven Fox Subject: FIRE21-0112 TR30142 SPK FINAL LOT 56 Location: 31619 DILL CT Start: Wed 9/8/2021 9:00 AM End: Wed 9/8/2021 9:30 AM Recurrence: (none) VIA Organizer: Steven Fox Call Handling Mode 2: 2 Rep. Name: RACHEL Phone#: 909-906-5921 Cell#: Co. Name: KPS CrossSt: PEPPERTREE HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Under round rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final Overhead rough piping UST/AST TANK Overhead hydro Installation UG flush / OK to connect I Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In-racksprinklers Seconds piping Hose racks Dispensers & shear valves X Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: I I Finish Time: 5 Steven Fox Subject: FIRE21-0112 TR30142 O/H ROUGH/HYDRO LOT 56 Location: 31619 DILL CT Start: Fri 7/9/2021 12:00 PM End: Fri 7/9/2021 12:30 PM Recurrence: (none) Organizer: Steven Fox Call Handling Mode 2: 2 Rep. Name: RACHEL Phone#: 909-906-5921 Cell#: Co. Name: KPS VIUJJJL. rcrrc-r[Ir[CC HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Under round hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping `C7 UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 3