Loading...
31558 BUCKEYE WAY FIRE21-0835 CYPRESS NORTHJohnathan Baker Subject: FIRE21-0835 TR30142 SPK FINAL LOT 91 Location: 31558 BUCKEYE WY Start: End: Recurrence: Organizer: Call Handling Mode 2 Rep. Name: RACHEL Phone#: 909-906-5921 Fri 10/29/2021 9:30 AM Fri 10/29/2021 10:00 AM (none) Menifee OFM 2 Cell#: Co. Name: KPS CrossSt: CYPRESS NORTH HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final etkctor test FIRE SPRINKLER DAuge/pre-action Weld inspection ,Final Overhead rough piping i UST/AST TANK Overhead hydro / Installation UG flush / OK to connect Removal Main drain/Inspect. Test / Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves X Final X Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation BuildingKnox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 15 (liana Gutierrez Subject: FIRE21-0835 TR30142 O/H ROUGH/HYDRO LOT 91 Location: 31558 BUCKEYE WAY Start: Wed 8/11/2021 4:00 PM End: Wed 8/11/2021 4:30 PM Recurrence: (none) Organizer: Menifee OFM Call Handling Mode 2: 2 Rep. Name: RACHEL Phone#: 909-906-5921 Cell#: Co. Name KPS CrossSt: CYPRESS HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block re -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Delu a/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Seconda piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: I I Finish Time: 29