Loading...
31501 BUCKEYE WAY FIRE21-0888 PEPPERTREE(liana Gutierrez Subject: FIRE21-0888 TR30142 SPK FINAL LOT 27 Location: 31501 BUCKEYE WY Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: RACHEL Phone#: 909-906-5921 Thu 10/21/2021 11:30 AM Thu 10/21/2021 12:00 PM (none) Menifee OFM 2 Cell#: Co. Name: KPS UrUSSOL P'mrrmm I MCC HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rou h;wire inspection Under round rough FunQfion test Under round hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro 4kort test Flush da WIM6ical shutdown ctor test Final FIRE SPRINKLER elu e/ re -action Weld inspection Final Overhead rough piping ,/ UST/AST TANK Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In-racksprinklers Secondary piping Hose racks Dispensers & shear valves X Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detections stem Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle modellplacement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing s stem T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 15 Steven Fox Subject: Location: Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: RACHEL Phone#: 909-906-5921 FIRE21-0888 TR30142 O/H ROUGH/HYDRO LOT 27 31501 BUCKEYE WAY Fri 8/6/2021 8:30 AM Fri 8/6/2021 9:00 AM (none) Menifee OFM 2 Cell#: Co. Name: KPS %iIVJJJI. rCrr CrxI RCC HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Under round rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 5