Loading...
26461 DUBLIN CT FIRE21-0908 PEPPERTREEJohnathan Baker Subject: FIRE21-0908 TR30142-2 FINAL LOT 134 Location: 26461 DUBLIN CT Start: End: Recurrence: Meeting Status: Organizer: Call Handling Mode 2: Rep. Name: RACHEL Phone#: 909-906-5921 Tue 11/23/2021 2:00 PM Tue 11/23/2021 2:30 PM (none) Meeting organizer Johnathan Baker 2 Cell#: Co. Name: KPS CrossSt: PEPPERTREE HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler Monitoring SPRINKLER U.G. Final / Thrust block pre -pour ,SPECIAL SUPPRESSION Underground rough D,6o fan test Under round hydro A rt test Flush Vechanical shutdown Final \ /betector test FIRE SPRINKLER Delu a/pre-action Weld inspection i Final Overhead rough piping / UST/AST TANK Overhead hydro / Installation UG flush / OK to connect 7 Removal Main drain/Inspect. Test I / Emergency shut off High pile storage Primary piping In-racksprinklers Seconda piping Hose racks ' Dis ensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final / Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final 1 Iliana Gutierrez Subject: Location: Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: RACHEL Phone#: 909-906-5921 FIRE21-0908 TR30142 O/H ROUGH/HYDRO LOT 134 26461 DUBLIN CT Wed 10/13/2021 9:30 AM Wed 10/13/2021 10:00 AM (none) Menifee OFM 2 Cell#: Co. Name: KPS CrossSt: PEPPERTREE HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emerqencv shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupant Start Time: Finish Time: Start Time: Finish Time: 13