26449 DUBLIN CT FIRE21-1071 PEPPERTREEJohnathan Baker
Subject: FIRE21-1071 TR30142-2 FINAL LOT 135
Location: 26449 DUBLIN CT
Start:
End:
Recurrence:
Meeting Status:
Organizer:
Call Handling Mode 2:
Rep. Name: RACHEL
Phone#: 909-906-5921
Tue 11/23/2021 2:00 PM
Tue 11/23/2021 2:30 PM
(none)
Meeting organizer
Johnathan Baker
2
Cell#:
Co. Name
KPS
CrossSt: PEPPERTREE
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Under round rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler eonitoring
SPRINKLER U.G.
Final/ /
Thrust block pre -pour
/ SPECIAL SUPPRESSION
Underground rou h
I X
'
-Doof fan test
Underground hydro
v._
A)dbrt test
Flush
\
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
/
Final
Overhead rough piping
UST/AST TANK
Overhead hydro
/ \
Installation
UG flush / OK to connect /
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
/
Prima piping
In-racksprinklers
Secondary piping
Hose racks
Dispensers & shear valves
X
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
/
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
/
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection /
Tract access/hydrant verification
Final /
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Buildinq Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
37
Iliana Gutierrez
Subject:
Location:
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: RACHEL
Phone#: 909-906-5921
FIRE21-1071 TR30142 O/H ROUGH/HYDRO LOT 135
26449 DUBLIN CT
Wed 10/13/2021 9:30 AM
Wed 10/13/2021 10:00 AM
(none)
Menifee OFM
2
Cell#:
Co. Name: KPS
ta[U,1Jl. rcrrmn I mcc
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time: Finish Time:
Start Time: Finish Time:
11