26050 REDOAK ST FIRE21-0629 PEPPERTREEJohnathan Baker
Subject:
FIRE21-0629 TR30142 SPK FINAL LOT 66
Location:
26050 REDOAK ST
Start:
Wed 11/10/2021 3:00 PM
End:
Wed 11/10/2021 3:30 PM
Recurrence: (none)
Organizer: Johnathan Baker
Call Handling Mode 2: 2
Rep. Name: RACHEL
Phone#: 909-906-5921
Cell#:
Co. Name: KPS
CrossSt: PEPPERTREE
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Under round hydro
Duct detectors/velocity
Flush
24 hr. batte test /
Final
Sprinkler mo(nitoriX
SPRINKLER U.G.
Final
Thrust block pre -pour
SRECIAL, SUPPRESSION
Underground rough
Door fo te9t
Underground hydro
\
/
pjl e
Flush
Mecha6ical shutdown
Final
betq6tor test
FIRE SPRINKLER
D u e/pre-action
Weld inspection
JFinal
Overhead rough piping
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In-racksprinklers
Secondary i in
Hose racks
Dispensers & shear valves
Y
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detections stem
SeraSeray booths
Function Test
Hood/duct extin uishin
Gas/Electrical shut-off
i
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time:
25
Iliana Gutierrez
Subject: FIRE21-0629 TR30142 O/H ROUGH/HYDRO LOT 66
Location: 26050 REDOAK ST
Start: Tue 9/14/2021 11:30 AM
End: Tue 9/14/2021 12:00 PM
Recurrence: (none)
Organizer: Steven Fox
Call Handling Mode 2: 2
Rep. Name: RACHEL
Phone#: 909-906-5921
Cell#:
Co. Name: KPS
lrfUbb0L. rCrrCr\Ir\CG
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Under round hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Delu a/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emer ency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time:
23