26040 BOW CT FIRE21-0947 CYPRESSJohnathan Baker
Subject:
Location:
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: RACHEL
Phone#: 909-906-5921
FIRE21-0947 TR30142 SPK FINAL LOT 18
26040 BOW CT
Wed 11/10/2021 2:30 PM
Wed 11/10/2021 3:00 PM
(none)
Johnathan Baker
2
Cel I#:
Co. Name:
KPS
VI U00%JL. V 1 r1\LVV
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rou h
Function test
Underground hydro
Duct detectors/velocity/
Flush
24 hr. battery testy /
Final
S rinkler monit r-'
SPRINKLER U.G.
Fi 1 /
Thrust block pre -pour
SP L SUPPRESSION
Under round rough
oor fan tOt
Underground hydro
�Ab to
Flush
MechoYnical shutdown
Final
et ctor test
FIRE SPRINKLER
D lu e/ re -action
Weld inspection
-
inal
Overhead rough piping
UST/AST TANK
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
EmergencyEmwgency shut off
High pile storage
Primary piping
In-racksprinklers
Secondary piping
Hose racks
Dispensers & shear valves
X
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection /
Tract access/hydrant verification
Final /
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation Z
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time:
11
(liana Gutierrez
Subject:
Location:
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: RACHEL
Phone#: 909-906-5921
FIRE21-0947 TR30142 O/H ROUGH/HYDRO LOT 18
26040 BOW CRT
Mon 8/16/2021 1:00 PM
Mon 8/16/2021 1:30 PM
(none)
Menifee OFM
2
Cell#:
Co. Name: KPS
CrossSt: CYPRESS
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. batte test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start
Time:
Finish Time:
Start Time:
Finish Time:
37