28770 LOOKOUT CIRCLE FIRE21-0986 WESTWARDJohnathan Baker
Subject:
Location:
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: JUAN
Phone#: 951-358-9783
FIRE21-0986 TR31098 SPK FINAL LOT 225
28770 LOOKOUT CIRCLE
Fri 11/12/2021 1:30 PM
Fri 11/12/2021 2:00 PM
(none)
Johnathan Baker
2
Cell#:
Co. Name:
FSS
%i[U„Jl. vyCJ I vvMr.LJ
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test /
Underground hydro
Duct detectors/velocity/
Flush
24 hr. battery test /
Final
Sprinkler monitoring/
SPRINKLER U.G.
Final /
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rou h
Door fan tit /
Underground hydro
I
Abort tesf/
Flush
Mechapdcal sWtdown
Final
I beke6tor to
FIRE SPRINKLER
\T
TQeluge/pr'e-action
Weld inspection
Final
Overhead rough piping
UST/AST TANK
Overhead hydro
'
196tallation
UG flush / OK to connect
emoval
Main drain/Inspect. Test
EmergencyEmeEgency shut off
High pile storage
Primary piping
In-racksprinklers
Secondary piping
Hose racks
\
Dispensers & shear valves
X
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detections stem
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start
Time:
Finish Time:
Start Time:
Finish Time:
49
Iliana Gutierrez
Subject: FIRE21-0986 TR31098 O/H ROUGH/HYDRO LOT 225
Location: 28770 LOOKOUT CIRCLE
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: HECTOR
Phone#: 951-847-2908
Wed 8/25/2021 12:00 PM
Wed 8/25/2021 12:30 PM
(none)
Menifee OFM
2
Cel I#:
Co. Name:
FSS
urossJi:yVCJ I VV/-XMU
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Under round rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary pipin
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
I Finish Time:
29