27153 LASSO WAY FIRE21-1267 TRAILHEADJohnathan Baker
Subject:
Location:
Start:
End:
Recurrence:
Meeting Status:
Organizer:
Call Handling Mode 2:
Rep. Name: JUAN
Phone#: 951-358-9783
FIRE21-1267 TR31098 SPK FINAL LOT 55
27153 LASSO WAY
Thu 12/16/2021 9:30 AM
Thu 12/16/2021 10:00 AM
(none)
Meeting organizer
Menifee OFM
2
Cell#:
Co. Name: FSS
%AUJJJI. I rwlLrlCNU
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectofs/velocit
Flush
24 hr. battefy test
Final
Sprinklerhonitoring
SPRINKLER U.G.
Fingf /
Thrust block pre -pour
r\ ,
\
_ J /SPECIAL SUPPRESSION
Underground rough
Doc/fan test
Underground hydro
\
At 6rt test
Flush
\ 1
DAlechanical shutdown
Final
'Detector test
FIRE SPRINKLER
,
/
Deluge/pre-action
Weld inspection
Final
'X/,
Overhead rough piping
/
UST/AST TANK
f '
O.CLLverhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
/
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
'
Dispensers & shear valves
,><.I
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
%
Hood/duct extinguishing
Gas/Electrical shut-off
/
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
"
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
10
Iliana Gutierrez
Subject: FIRE21-1267 TR31098 O/H ROUGH/HYDRO LOT 55
Location: 27153 LASSO WAY
Start:
End:
Recurrence:
Meeting Status:
Organizer:
Required Attendees:
Rep. Name: HECTOR
Phone#: 951-847-2908
Tue 9/21/2021 11:00 AM
Tue 9/21/2021 11:30 AM
(none)
Meeting organizer
Menifee OFM
Menifee OFM
Cell#:
Co. Name: FSS
CrossSt: TRAILHEAD
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Under round rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
S piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
BuildingKnox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time: Finish Time:
21