Loading...
27153 LASSO WAY FIRE21-1267 TRAILHEADJohnathan Baker Subject: Location: Start: End: Recurrence: Meeting Status: Organizer: Call Handling Mode 2: Rep. Name: JUAN Phone#: 951-358-9783 FIRE21-1267 TR31098 SPK FINAL LOT 55 27153 LASSO WAY Thu 12/16/2021 9:30 AM Thu 12/16/2021 10:00 AM (none) Meeting organizer Menifee OFM 2 Cell#: Co. Name: FSS %AUJJJI. I rwlLrlCNU HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectofs/velocit Flush 24 hr. battefy test Final Sprinklerhonitoring SPRINKLER U.G. Fingf / Thrust block pre -pour r\ , \ _ J /SPECIAL SUPPRESSION Underground rough Doc/fan test Underground hydro \ At 6rt test Flush \ 1 DAlechanical shutdown Final 'Detector test FIRE SPRINKLER , / Deluge/pre-action Weld inspection Final 'X/, Overhead rough piping / UST/AST TANK f ' O.CLLverhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage / Primary piping In -rack sprinklers Secondary piping Hose racks ' Dispensers & shear valves ,><.I Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test % Hood/duct extinguishing Gas/Electrical shut-off / High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final " Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final 10 Iliana Gutierrez Subject: FIRE21-1267 TR31098 O/H ROUGH/HYDRO LOT 55 Location: 27153 LASSO WAY Start: End: Recurrence: Meeting Status: Organizer: Required Attendees: Rep. Name: HECTOR Phone#: 951-847-2908 Tue 9/21/2021 11:00 AM Tue 9/21/2021 11:30 AM (none) Meeting organizer Menifee OFM Menifee OFM Cell#: Co. Name: FSS CrossSt: TRAILHEAD HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Under round rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers S piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation BuildingKnox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: 21