27152 LASSO WAY FIRE21-1271 TRAILHEADJohnathan Baker
Subject:
Location:
Start:
End:
Recurrence:
Meeting Status:
Organizer:
Call Handling Mode 2:
Rep. Name: JUAN
Phone#: 951-358-9783
FIRE21-1271 TR31098 SPK FINAL LOT 54
27152 LASSO WAY
Thu 12/16/2021 10:00 AM
Thu 12/16/2021 10:30 AM
(none)
Meeting organizer
Menifee OFM
2
Cell#:
Co. Name:
FSS
%-.IUbbQL. i rwiLnr=r►v
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocit
Flush
24 hr.,6attery test
Final
\
Spripfkler monitoring
SPRINKLER U.G.
F'r{al
Thrust block pre -pour
/ SPECIAL SUPPRESSION
Underground rough
Do6r fan test
Underground hydro
I ,ytbort test
Flush
\\
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
/ \
b
Deluge/pre-action
Weld inspection
/ %
/
Final
Overhead rough piping
/ /
UST/AST TANK
Overhead hydro 2
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Secondwy piping
Hose racks
Dispensers & shear valves
X
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
/
Spray booths
Function Test
/
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
/
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
16
(liana Gutierrez
Subject: FIRE21-1271 TR31098 O/H ROUGH/HYDRO LOT 54
Location: 27152 LASSO WAY
Start: Tue 9/21/2021 10:30 AM
End: Tue 9/21 /2021 11:00 AM
Recurrence: (none)
Meeting Status: Meeting organizer
Organizer: Menifee OFM
Required Attendees: Menifee OFM
Rep. Name: HECTOR
Phone#: 951-847-2908
Cell#:
Co. Name: FSS
CrossSt: TRAILHEAD
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Under round rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Seconda piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start
Time: Finish Time:
15