27143 SETTLEMENT ST FIRE21-1152 TRAILHEADJohnathan Baker
Subject:
Location:
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: HECTOR
Phone#: 951-847-2908
FIRE21-1152 TR31098 SPK FINAL LOT 40
27143 SETTLEMENT ST
Fri 12/10/2021 10:30 AM
Fri 12/10/2021 11:00 AM
(none)
Johnathan Baker
2
Cell#:
Co. Name: FSS
LAUSSOU I MMILMMAU
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPIRCIAL SUPPRESSION
Underground rough
boor faVtest
Underground hydro
'AbQrl,test
Flush
'
Mechanic/al shutdown
Final
\
\
Detectdr test
FIRE SPRINKLER
\
Deluge/pre-action
Weld inspection
\ \
FiKal
Overhead rough piping
/
\ \
UST/AST TANK
Overhead hydro
\
Installation
UG flush / OK to connect
/
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
/
Primary piping
In -rack sprinklers
/
Secondary piping
Hose racks
/
Dispensers & shear valves
X
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time:
21
Steven Fox
Subject: FIRE21-1152 TR31098 O/H ROUGH/HYDRO LOT 40
Location: 27143 SETTLEMENT ST
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name: HECTOR
Phonek 951-847-2908
Fri 9/10/2021 3:30 PM
Fri 9/10/2021 4:00 PM
(none)
Steven Fox
2
Cell#:
Co. Name: FSS
CrossSt: TRAILHEAD
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Under, round hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping
X
UST/AST TANK
X
Overhead hydro
Installation
UG flush / OK to connect
'
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
Primary piping
In -rack sprinklers
Seconda pipin
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time:
39