Loading...
27143 SETTLEMENT ST FIRE21-1152 TRAILHEADJohnathan Baker Subject: Location: Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: HECTOR Phone#: 951-847-2908 FIRE21-1152 TR31098 SPK FINAL LOT 40 27143 SETTLEMENT ST Fri 12/10/2021 10:30 AM Fri 12/10/2021 11:00 AM (none) Johnathan Baker 2 Cell#: Co. Name: FSS LAUSSOU I MMILMMAU HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPIRCIAL SUPPRESSION Underground rough boor faVtest Underground hydro 'AbQrl,test Flush ' Mechanic/al shutdown Final \ \ Detectdr test FIRE SPRINKLER \ Deluge/pre-action Weld inspection \ \ FiKal Overhead rough piping / \ \ UST/AST TANK Overhead hydro \ Installation UG flush / OK to connect / Removal Main drain/Inspect. Test Emergency shut off High pile storage / Primary piping In -rack sprinklers / Secondary piping Hose racks / Dispensers & shear valves X Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 21 Steven Fox Subject: FIRE21-1152 TR31098 O/H ROUGH/HYDRO LOT 40 Location: 27143 SETTLEMENT ST Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: HECTOR Phonek 951-847-2908 Fri 9/10/2021 3:30 PM Fri 9/10/2021 4:00 PM (none) Steven Fox 2 Cell#: Co. Name: FSS CrossSt: TRAILHEAD HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Under, round hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping X UST/AST TANK X Overhead hydro Installation UG flush / OK to connect ' Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Seconda pipin Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 39