Loading...
27136 LASSO WAY FIRE21-1266 TRAILHEADJohnathan Baker Subject: Location: Start: End: Recurrence: Meeting Status: Organizer: Call Handling Mode 2: Rep. Name: JUAN Phone#: 951-358-9783 FIRE21-1266 TR31098 SPK FINAL LOT 52 27136 LASSO WAY Thu 12/16/2021 9:30 AM Thu 12/16/2021 10:00 AM (none) Meeting organizer Menifee OFM 2 Cell#: Co. Name: FSS lilUbbOL. 1 rVA1LrlC/1U HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Under round hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough ' . Door•fan test Underground hydro Abort tesK Flush ` \ Mechanical shutdown Final \ Detbdor test FIRE SPRINKLER ` D61u e/ re -action Weld inspection \ �"I./Final Overhead rough piping \I UST/AST TANK Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Seconds piping Hose racks Dispensers & shear valves X Final 7'— Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final 12 Iliana Gutierrez Subject: FIRE21-1266 TR31098 O/H ROUGH/HYDRO LOT 52 Location: 27136 LASSO WAY Start: Tue 9/21/2021 10:00 AM End: Tue 9/21/2021 10:30 AM Recurrence: (none) Meeting Status: Meeting organizer Organizer: Menifee OFM Required Attendees: Menifee OFM Rep. Name: HECTOR Phone#: 951-847-2908 Cell#: Co. Name: FSS CrossSt: TRAILHEAD HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block pre -pour Rough -wire inspection Underground rough Function test Under round hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary pipin Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: 13