27135 SETTLEMENT ST FIRE21-1158 TRAILHEADJohnathan Baker
Subject:
Location.
Start:
End:
Recurrence:
Organizer:
Call Handling Mode 2:
Rep. Name. HECTOR
Phone#: 951-847-2908
FIRE21-1158 TR31098 SPK FINAL LOT 41
27135 SETTLEMENT ST
Fri 12/10/2021 11:00 AM
Fri 12/10/2021 11:30 AM
(none)
Johnathan Baker
2
Cell#:
Co. Name: FSS
%a[UbbOL. i rv-uL_nCZrw
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire infection
Underground rough
Function tesJ(
Underground hydro
Duct detec)brs/velocity
Flush
24 hr. balfery test
Final
Sprinkl monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Do,6r fan test
Underground hydro
Abort test
Flush
IVlechanical shutdown
Final
N `
Detector test
FIRE SPRINKLER
\.
i
Deluge/pre-action
Weld inspection
\
1
Final
Overhead rough piping
;'
\ \1 /
UST/AST TANK
Overhead hydro
/
Installation
UG flush / OK to connect
/
Removal
Main drain/Inspect. Test
Emergency shut off
High pile storage
/
Primary piping
In -rack sprinklers
V
Seconda piping
Hose racks
/
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
/
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
i
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Buil ing Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time:
25
Steven Fox
Subject:
FIRE21-1158 TR31098 O/H ROUGH/HYDRO LOT 41
Location:
27135 SETTLEMENT ST
Start:
Fri 9/10/2021 4:00 PM
End:
Fri 9/10/2021 4:30 PM
Recurrence:
(none)
Organizer:
Steven Fox
Call Handling Mode 2:
2
Rep. Name: HECTOR
Phone#: 951-847-2908
Cell#:
Co. Name: FSS
CrossSt: TRAILHEAD
HYDRANT SYSTEM
PASS
FAIL
FIRE ALARM
PASS
FAIL
Thrust block pre -pour
Rough -wire inspection
Underground rough
Function test
Underground hydro
Duct detectors/velocity
Flush
24 hr. battery test
Final
Sprinkler monitoring
SPRINKLER U.G.
Final
Thrust block pre -pour
SPECIAL SUPPRESSION
Underground rough
Door fan test
Underground hydro
Abort test
Flush
Mechanical shutdown
Final
Detector test
FIRE SPRINKLER
Deluge/pre-action
Weld inspection
Final
X
Overhead rough piping'
UST/AST TANK
X
Overhead hydro
''
Installation
UG flush / OK to connect
Removal
Main drain/Inspect. Test
Emergencv shut off
High pile storage
Primary piping
In -rack sprinklers
Secondary piping
Hose racks
Dispensers & shear valves
Final
Final
KITCHEN HOOD EXTINGUISHING
MISC. INSPECTION
Detection system
Spray booths
Function Test
Hood/duct extinguishing
Gas/Electrical shut-off
High pile rack storage
Nozzle model/placement
H.P. vents/access/corridors
Fire alarm connection
Tract access/hydrant verification
Final
Other:
SPRAY BOOTHS
KNOX SYSTEM
Installation
Building Knox box
Air flow test
Gate access Knox box/padlock
Mechanical interlock
BUILDING INSPECTIONS
Extinguishing system
T/I final
Fire alarm connection
Shell final
Final
Final for occupancy
Start Time:
Finish Time:
Start Time:
Finish Time:
41