Loading...
24505 LEGION CT FIRE21-1023 VALOR WESTIliana Gutierrez Subject: Location: Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: JUAN Phone#: 951-358-9783 FIRE21-1023 TR36485 SPK FINAL LOT 20 24505 LEGION CT Wed 11/10/2021 11:30 AM Wed 11/10/2021 12:00 PM (none) Menifee OFM 2 Cell#: Co. Name: FSS CrossSt: VALOR WEST HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block re -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocit Flush 24 hr. baftey test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Obor fan test Underground hydro i Abort test Flush Mechanical shutdown Final / Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection % Fi I Overhead rough piping /ilhi., X UST/AST TANK Overhead hydro on UG flush / OK to connect moval Main drain/Inspect. Test / mer enc shut off High pile stcra e / Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves X Final / Final KITCHEN HOOD EXTiNIGUISHING MISC. INSPECTION Detections stem / Spray booths Function Test ;' Hood/duct extinguishing Gas/Electrical shut-Dff High pile rack storage Nozzle model/pla6ement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupanc Start Time: Finish Time: Start Time: Finish Time: 21 Iliana Gutierrez Subject: FIRE21-1023 TR36485-7 O/H ROUGH/HYDRO LOT 20 Location: 24505 LEGION CT Start: End: Recurrence: Organizer: Call Handling Mode 2: Rep. Name: HECTOR Phone#: 951-847-2908 Mon 7/19/2021 9:30 AM Mon 7/19/2021 10:00 AM (none) Menifee OFM 2 Cell#: Co. Name: FSS CrossSt: VALOR WEST HYDRANT SYSTEM PASS FAIL FIRE ALARM PASS FAIL Thrust block re -pour Rough -wire inspection Underground rough Function test Underground hydro Duct detectors/velocity Flush 24 hr. battery test Final Sprinkler monitoring SPRINKLER U.G. Final Thrust block pre -pour SPECIAL SUPPRESSION Underground rough Door fan test Underground hydro Abort test Flush Mechanical shutdown Final Detector test FIRE SPRINKLER Deluge/pre-action Weld inspection Final X Overhead rough piping UST/AST TANK X Overhead hydro Installation UG flush / OK to connect Removal Main drain/Inspect. Test Emergency shut off High pile storage Primary piping In -rack sprinklers Secondary piping Hose racks Dispensers & shear valves Final Final KITCHEN HOOD EXTINGUISHING MISC. INSPECTION Detection system Spray booths Function Test Hood/duct extinguishing Gas/Electrical shut-off High pile rack storage Nozzle model/placement H.P. vents/access/corridors Fire alarm connection Tract access/hydrant verification Final Other: SPRAY BOOTHS KNOX SYSTEM Installation Building Knox box Air flow test Gate access Knox box/padlock Mechanical interlock BUILDING INSPECTIONS Extinguishing system T/I final Fire alarm connection Shell final Final Final for occupancy Start Time: Finish Time: Start Time: Finish Time: 13